Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
1751 West Bengal Request for permission of laying of 254 mm casing pipe for 6" dia (152.4 mm) CS Pipeline & 200 mm casing piper for 125 mm MDPE pipeline at Chainage 143.042 of NH-31D with approx length of 60 mtr nearby Kholta Check Post, SH -12, Coochbihar-Alipurduar Road (320.01 Kb application-pdf)
21-06-2024
1752 Jharkhand ROW permission for laying of Water Pipeline of DW & SD Km 248.026 to 250.017 (LHS) along and across the NH-33 (length 1713 meter) (1.39 Mb application-pdf)
20-06-2024
1753 Gujarat Proposal seeking ROW permission of laying 66KV S/C Kharach-Sisodara Line 66KV (3+1) Spate 1CX630 Sgmm Underground Electric Power Cable Line crossing on VME no NE-4/NH-148N at Km 261+300 to Km 261+400, near Village-Tarsadi, Taluka-Mangrol, District-Surat in the State of Gujarat (2.78 Mb application-pdf)
20-06-2024
1754 Gujarat Proposal seeking ROW permission for laying of 66KV D/C Veraval-Ill to Ribda Line with 1C X 630 sqmm (6+1 square) Underground Cable parallel to NH-27 from Km 161+296 to Km 163+578 on Right Hand Side, near Village-Veraval (Kotda Sangani, Ribda) Talukar-Gondal, District-Rajkot in the State of Gujarat (688.11 Kb application-pdf)
20-06-2024
1755 Gujarat Proposal seeking ROW permission for 66KV S/C Gondal (220KV)-KSS line & 66KV S/C Gondal-Hadamtala Underground Cable laying between Km 145+200 to Km 146+200 on RHS and crossing at Km 146+200 and laying from Km 146+200 to Km 152+550 on LHS under the Kishan Suryoday Yojna scheme of GOG in the State of Gujarat (691.28 Kb application-pdf)
20-06-2024
1756 Assam Proposal seeking Permission for construction of 220 KV Double Circuit Transmission line from Katalguri (NEEPCO) to Namsai (POWERGRID) for Overhead Crossing at Km 848.415 on Dirak–Rupai and at Km 829.603 on Chowkham–Namsai Road (NH-15) (362.62 Kb application-pdf)
20-06-2024
1757 Telangana Proposal for laying of Gas Pipeline of dia 4” CS along with 125mm MDPE by M/s. Torrent Gas Pvt. Ltd for a length of 200m from Km.457+000 to Km.457+200 (RHS) by Open trench Methodology and across NH-44 at Km. 457+000 by HDD Methodology on Nagpur-Hyderabad section of NH-44 in the State of Telangana (133.96 Kb application-pdf)
20-06-2024
1758 Maharashtra Proposal for Laying of 4” dia. Steel Gas Pipeline with OFC along NH-160A from Km. 2.118 to Km. 8.990 Total length 6.872 km and 1 no. of Crossing at Km. 8.990 across NH-160A (94.87 Kb application-pdf)
20-06-2024
1759 Haryana NOC permission for laying of Underground 4" diameter steel gas pipeline along NH-919 chainage km. 67.100 in Dhatir to km. 76.900 in Palwal and 2 nos. crossing at km. 75.50 and 76.90 in Palwal District in the State of Haryana (4.99 Mb application-pdf)
20-06-2024
1760 Tamil Nadu Rehabilitation and Up-gradation of NH-209 from Km. 123.550 to Km.150.400 of Dindigul–Bangalore Road(Pollachi to Coimbatore Section) to 4 lane with paved shoulder in the State of Tamil Nadu under NHDP-IV on EPC Basis (93.45 Kb application-pdf)
19-06-2024

Pages