Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
1 Uttar Pradesh Proposal for the permission of laying U/G Water Pipe Line at Ch. 95+245 to 98+240 Km and crossing Ch. 97+803 & 97+808 Km (Length-120m) across NH-44 District-Lalitpur, in the State of Uttar Pradesh (3.26 Mb application-pdf)
17-10-2025
2 Haryana Permission for laying of sewerage line (400mm DWC HDPE Pipe) of Block development & Panchayat Officer at km. 44+445 to km. 44+550 (RHS) (length 102.0m) & km. 44+550 to km. 44+660 LHS (length 110.0m) & crossing at km. 44+550 (RHS to LHS) (Length 60.0m) (Total Length 275.0m) on NH-44 in the State of Haryana (389.21 Kb application-pdf)
16-10-2025
3 Madhya Pradesh Proposal for permission of crossing of Electric cable across NH-52 at Ch. No. 202+170 & 202+200 at Village-Karanwas, District-Rajgarh State of Madhya Pradesh (2.42 Mb application-pdf)
16-10-2025
4 Madhya Pradesh Proposal for permission for PGCIL, Bhopal 765KV Kurawar Transmission overhead crossing line at Ch. 231.373 on Biaora-Dewas section of NH-52, Village-Nainawada, Tehsil-Sarangpur & District-Rajgarh in the State of Madhya Pradesh (2.23 Mb application-pdf)
16-10-2025
5 Maharashtra Demand for obtaining permission for laying of 33 KV overhead electrical transmission line crossing at Km. 104+525 on Akkalkot Solapur NH-150(E), (Akkalkot Bypass), Tal.- Akkalkot, District-Solapur, in the State of Maharashtra (6.04 Mb application-pdf)
16-10-2025
6 Punjab Request for granting permission for laying of proposed 6 & 4 dia natural Gas Steel pipeline along the nH-07 at Km. 138.658 (RHS) (bathinda to barnala road) for the project CNG & DRS Connectivity near Bucho Khurd in Bathinda Tehsil of Bathinda District in the State of Punjab (371.03 Kb application-pdf)
16-10-2025
7 West Bengal Permission for laying underground water pipeline along RHS of NH-16 (Old NH-6) from Km 126+000 to 128+750 (Kukrada PWSS) under Kharagpur Sub-Division of Midnapore Division PHE Dte (547.80 Kb application-pdf)
15-10-2025
8 Uttar Pradesh Proposal for permission for laying underground water supply pipe line under Jal Jeevan Mission ALONG from Km. 138+092 to Km. 141+210 (3118m) LHS, from Km. 140+770 to Km. 142+666 (1896m) RHS, from Km. 146+443 to Km. 147+622 (1179m) LHS, from Km. 148+676 to Km. 149+678 (1002m) LHS, Km. 159+320 in Vill. Baraunia, Saidpur, Behta Dheera, Tolwa Antdanpur, Kaurah & Korria in Block Bawan, Todarpur in Tehsil Shahbad & Hardoi in District- Hardoi on NH-731 (Shajahanpur-Hardoi Section) in the State of Uttar Pradesh (968.28 Kb application-pdf)
15-10-2025
9 Uttar Pradesh Permission for underground crossing of double circuit between Ch. 41.897 and Ch.41.997 , Ch. 45.683 on NH-30 in the construction work of newly constructed 33KV of green field yeast manufacturing plant of A.B. Mauri India Pvt. Ltd. (547.90 Kb application-pdf)
15-10-2025
10 Uttar Pradesh Proposal for permission for laying of underground water supply pipe line under Jal Jeevan Mission by HDD Method from Km. 310+750 to Km. 311+000 (250m) LHS & from Km. 310+750 to Km. 311+000 (250m) RHS (Total Length LHS + RHS = 500m) & crossing at Km. 310+850 (Total Length of crossing = 35m) at village Richola Kifaytulla Block, Tehsil-Nawabganj & District Bareilly at NH-30 in theState of Uttar Pradesh (622.33 Kb application-pdf)
15-10-2025

Pages