Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
1 Maharashtra Widening of existing 2 lane carriageway to 4/6 lane divided carriageway configuration for Vadape–Gonde (Km 539.5–Km 440) section of NH-3 in the State of Maharashtra–Mahindra & Mahindra Ltd.’s Proposal for Laying 33 KV Electric Overhead Line on RSJ Pole from Km. 460.000 to Km. 464.000 on NH-3 (94.37 Kb application-pdf)
25-01-2024
2 Assam Proposal seeking Permission for laying MDPE 63mm Dia Carrier Pipeline 150mm Dia MS Casing Pipe, Natural Gas pipeline through HAB/HDD Method across the NH-61 from Km 252.878 and from Km 252.677 to Km 253.372 (L=1.39 km) in Vill-Amguri Town, Circle-Amguri, District-Sivasagar, Assam by Assam Gas Company Limited under Jorhat NH Division (379.64 Kb application-pdf)
25-01-2024
3 Gujarat Proposal for permission for laying of 04 Nos. underground 33 KV HT cable of M/s Torrent Power Ltd. at NH-147 at km 36/820 (across) in the State of Gujarat (843.91 Kb application-pdf)
25-01-2024
4 Maharashtra Four laning of Sinnar to Shirdi Section of NH-160 from Design Ch:0/000 to 50/943 including Sinnar Bypass of 3.375 km in the State of Maharashtra on Hybrid Annuity Mode–MSEDCL’s proposal for Erection of 11 KV Electrical Overhead distribution Line along NH-160 from Km. 10.800 to Km. 11.300 on RHS (95.37 Kb application-pdf)
25-01-2024
5 Rajasthan Tower Package-TW02 for 765 D/C Bhadla 2 (PS)-Sikar 2 Transmission line (Part-II) SEZ phase-II Part-C under TBCB associate with green energy Corridor Interstate Transmission Scheme (ISTS) Regarding submission of documents for BG Licence Fees Pertain to Crossing of NH-89 Ajmer-Bikaner Road (Chainage 203 &204 km) (262.94 Kb application-pdf)
24-01-2024
6 Bihar Permission for laying of 10" Carbon Steel Gas Pipeline with OFC & SV Chamber along NH-27 ((Old-57) from Ch.63+100 Delhi more flyover to Ch.82+100 Sakari approx. length 19 Km in State of Bihar (1.18 Mb application-pdf)
24-01-2024
7 Uttar Pradesh Permission for laying of proposed Sewer Pipeline U/G 200 mm @ C.l. Ductile Iron Pipe of Meerut Development Authority from Km. 58.110 (LHS) to Km. 58.429 (LHS) (Length 319m) and one crossing at Km. 58.110 (Length 49.0 m) (Total Length 368m) on NH-58 (New NH-334) (Delhi to Haridwar Road) in Village-Rampur Pavati, District-Meerut in the Uttar Pradesh (104.63 Mb application-pdf)
24-01-2024
8 Gujarat Proposal seeking ROW permission for laying 11KV 3-Core 185sqmm Underground XLPE Cable across NH-48 at Km 253+867 to Km 253+967, near Village-Vav, Taluka–Kamrej & District–Surat on Mumbai-Ahmedabad section of NH-48 in the State of Gujarat (1.23 Mb application-pdf)
22-01-2024
9 Haryana Construction of 4-lane NH-334P-Pkg-4 (From km. 0+000 to km. 29+600,29.6 km), starting from Bawana Industrial Area, Delhi till Sonipat bypass of NH-352A at village Barwasani, Sonipat(HR) as spur of NH-344P on EPC mode-NOC for overhead crossing of Bawana-Barwasani (NH- 344P) by LILO of 765kv S/C Meerut-Bhiwani Transmission line at Km 11+250 under TBCB (Pkg-TW03) at Narela (590.95 Kb application-pdf)
19-01-2024
10 Haryana Proposal for NOC of overhead crossing on NH-344P (near village Harewali) for construction of LILO of Bawana-Mandola 400 kv D/C line at Maharani Bagh substation and extension of above LILO section from Maharani Bagh upto Narela substation to form 2x400 kv D/C Maharani Bagh-Narela line on M/C tower using Twin HTLS conductor (621.50 Kb application-pdf)
19-01-2024

Pages