Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
1711 Odisha Permission for laying water supply pipeline on RHS of NH-16 from km. 430+500 to km. 434+500 at Chatrapur (1.51 Mb application-pdf)
08-07-2024
1712 Rajasthan Proposal of Grant of Permission for Laying Water Pipeline along NH and Across the road at various location at NH-58 (8 Nos. road crossing and 3.670 Km. along the road at MS-73.400, MS-80.850, MS-86.300, MS-87.480, M5-92.550, MS-98.545, MS-104.555, MS-88.650 and along the road MS-75.800 to 78.600 (RHS) and MS-76.730 to MS-77.600 (LHS), total length is 4.150 Km. (4150 mitr), ROW applied in the State of Rajasthan under Jal Jiwan Mission (856.97 Kb application-pdf)
05-07-2024
1713 Uttar Pradesh Proposal for the permission of laying U/G Water Pipeline (HDPE Pipe) By HDD Method NH-27 (OLD NH-28), Lucknow-Ayodhya Road, From Ch. 76.900 to, Ch. 75.450, LHS & RHS (Length=2900.00m), Ch. 120.201 to Ch. 118.623 LHS & RHS (Length=3156.00m) and two crossing at Ch. 76.000 (Length=45.002m) & at Ch. 119.319 (Length=54.860m), Total Length=6155.862m At Gram Panchayat-Babugarh, Hajipur Singhpur, Block-Mavai & Rudauli, District-Ayodhya in the State of Uttar Pradesh. (4.95 Mb application-pdf)
05-07-2024
1714 Uttar Pradesh Proposal for laying Natural gas 8” Dia Carbon Steel Gas Pipeline of M/s Indraprastha Gas Limited along the Garhmukteshwar to Meerut Road on NH-709A (Old SH-14) from Old Ch. 00+000 to Old Ch. 06+000 (RHS) in Total Length=06 km., Design Ch. 20+200, Design Ch. 25+200, Design Ch. 28+200 and Ex. Ch. 34+000 in Hapur & Meerut in the State of Uttar Pradesh (2.15 Mb application-pdf)
05-07-2024
1715 Maharashtra Proposal for Laying of Water Supply Pipeline at Subline No. IVB of Sulwade Jamphal Kanoli Lift Irrigation Scheme along NH-3 (Total Length 0.9 Km) near Laling village, Dhule (91.42 Kb application-pdf)
05-07-2024
1716 Punjab Proposal for laying road crossing of 800mm dia sewerage pipeline at km. 31.600 on Rajpura Patiala Road section of NH-07 in the State of Punjab (388.40 Kb application-pdf)
05-07-2024
1717 Uttar Pradesh Proposal for grant of permission for crossing (underground) of Electric Cable on NH for proposed New 11 KV Feeder-Town 2 District-Gajraula (Amroha) on Moradabad-Hapur Section of NH-09 (Old NH-24) at Ch. 107+100 (LHS to RHS) in the State of Uttar Pradesh (4.20 Mb application-pdf)
04-07-2024
1718 Uttar Pradesh Proposal for the permission of laying U/G 150mm Carbon steel pipeline from Ch. 20.132 to Ch. 18.936, LHS (Length+1196.0m.) & Two crossing at Ch. 18.936, LHS to RHS (Length=2x46-92.0m) (Total length for Carbon Steel Pipeline=1196.0+92.0=1288.0m.) & 125mm MDPE Pipeline from Ch. 20.132 to Ch. 17.250,LHS & RHS (Both Side of Road) (Length = 2x2882.0m. = 5764.0m.) along NH-27, (Lucknow-Faizabad Road) at Village-Safedabad, Tehsil Nawabganj, District-Barabanki in the State of Uttar Pradesh (4.93 Mb application-pdf)
04-07-2024
1719 West Bengal Proposal for permission/NOC for laying/ crossing of 33 KV UG cable (3C x 400 sqmm) 2 run at Km 13+800 on NH-60 (New NH-16) for completing of 33KV link line from Nalbahar to Rupsa PSS (33/11) KV under ODSSP-V Scheme (336.44 Kb application-pdf)
04-07-2024
1720 Jharkhand Proposal for NOC for 33kv (@95mm dia, 14 Nos.) underground XLPE cable crossing through casing/conduit pipe at Chainage km 54+410 on NH-320B Gota-Ormanjhi route (662.08 Kb application-pdf)
04-07-2024

Pages