Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
4451 Maharashtra Proposal of permission for laying Steel Gas Pipeline along National Highway from Hotel Dhanshree, Alandi Phata to Chakan Petrol pump depot, Pune - Nashik Road NH-60 Km,28/800 to Km, 32/500 Righat side going to words Pune and across (Ch Km, 22/900, 25/300, 28/800) Total length 3.5 Km, in the state of Maharashtra (643.18 Kb application-pdf)
08-10-2021
4452 Maharashtra Proposal for grant of permission for laying Optical Fibre Cable (OFC) along NH-4 at Shedung toll gate from Km, 103/150 to 103/900 in LHS for the total length of 750 mt in the state of Maharashtra (660.09 Kb application-pdf)
08-10-2021
4453 Gujarat Permission for the install/crossing of Overhead 66KV S/C Transmission line of M/s Gujarat Energy Transmission Corporation Limited across NH-47 at km 98+670/680 for the Total Project Length as 45.00 m, in the State of Gujarat (675.89 Kb application-pdf)
07-10-2021
4454 Haryana Permission for crossing of 250 mm diameter water supply pipeline at km. 163.875 in Rohtak Hisar section of NH - 09 (old NH -10) Highway in Village Mayyar and District - Hisar in the State of Haryana (692.11 Kb application-pdf)
07-10-2021
4455 Haryana Permission for crossing of 250 mm diameter water supply pipeline at km. 163.875 in Rohtak Hisar section of NH - 09 (old NH -10) Highway in Village Mayyar and District - Hisar in the State of Haryana (418.23 Kb application-pdf)
07-10-2021
4456 Punjab Permission for laying proposed Gas pipeline of 8-inch Diameter steel natural gas pipeline from km 116.850 to km 117.515 along and crossing at km 116.850 across old NH 503 A in Amritsar Una section Highway around District-Hoshiarpur in the State of Punjab (118.70 Kb application-pdf)
07-10-2021
4457 Odisha Rehabilitation and up-gradation of existing two lane to four lane standards from Duburi to Chandikhol section (Km.388.376 to Km.428,074) of NH-200 (New NH-53) in the state of Odisha under NHDP-lIl - Laying & Crossing of water pipeline at chainage 402+440 to 425+000 (Brahmani bridge to Chandikhole) by RWSS Division, Jaipur (6.99 Mb application-pdf)
06-10-2021
4458 Gujarat Proposal for ROW permission for laying of Optical Fiber Cable along NH-48 from Km 36+400 to Km 37+000 (both side) (Total Length 1+200 Km) and Across NH-48 at Km 37+000 on Ahmedabad-Vadodara section of NH-48 in the state of Gujarat (1.78 Mb application-pdf)
06-10-2021
4459 Assam Proposal seeking permission for laying of Proposed Natural Gas and Crude Oil Pipeline across at (i) Ch 614.095 (ii) Ch 613.42 (iii) Ch 623.072 and (iv) Ch 622.20 of NH-37 by Oil India Limited in the State of Assam (649.94 Kb application-pdf)
06-10-2021
4460 Odisha Rehabilitation & Up-gradation of Cuttack- Angul section of NH-42 (New NH-55) to 4-lane in the State of Odisha under NHDP-III on EPC Mode Package-ll- Crossing of 600 mm dia slurry pipeline with OFC duct through 1000 mm dia casing pipe from RHS to LHS of NH-55 at chainage 77.975 from proposed MTPA iron ore beneficiation plant located at Vil- Bhanjapalli and Teherei to Dhenkanal Steel Plant of M/s Rungta Mines Ltd. (5.50 Mb application-pdf)
06-10-2021

Pages