Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
4441 Karnataka Four laning of Solapur-Bijapur section of NH-13 from Km. 0/000 to Km. 110/542 in the States of Maharashtra & Karnataka on DBFOT Basis - Proposal for the laying of Optical Fibre Cable by adopting HDD method along NH-52(Old-NH-13) fom Bijapur Ashram Road Km 102.700 to Bijapur Mahalbagayat Km.104.600 on RHS and one road crossing at Km 104.600 for total length of 1.90Km. in the State of Karnataka- Reg (18.20 Mb application-pdf)
01-04-2021
4442 Karnataka Four laning of Solapur-Bijapur section of NH-13 from Km. 0/000 to Km. 110/542 in the States of Maharashtra & Karnataka on DBFOT Basis - Proposal for the laying of Optical Fibre Cable by adopting HDD method along NH-52(Old-NH-13) fom Bijapur Ashram Road Km 102.700 to Bijapur Mahalbagayat Km.104.600 on RHS and one road crossing at Km 104.600 for total length of 1.90Km. in the State of Karnataka (18.20 Mb application-pdf)
01-04-2021
4443 Uttar Pradesh Permission for laying of U.P jal nigam 100mm dia pipeline (MS pipe) across NH-34 (old NH-86) across ch. 2.146 (RHS) to 2.160 (LHS) approximate lenght 50.40 at Naubasta (near to existing canal) in the state of UP (5.90 Mb application-pdf)
31-03-2021
4444 Assam Issuance of NOC for the Overhead Crossing of 132 KV DC Transmission Line from Biswanath Chariali to Itanagar at Km 211.430 in between AP 2/0 & AP 3/0 (799.51 Kb application-pdf)
31-03-2021
4445 Telangana NHAI – RO Hyderabad – PIU Hyderabad– Proposal for Permission for laying of OFC along NH-765 on Hyderabad- Dindi Section from Ch. 56/200 to Km.59/800 (RHS) through Open trench method and Crossing at Km.58/000 through HDD method in the State of Telangana (955.46 Kb application-pdf)
31-03-2021
4446 Assam Issuance of NOC for the overhead crossing of 132 KV DC Transmission Line from Biswanath Chariali to Itanagar at Km 211.430 in between AP 2/0 & AP 3/0 (799.51 Kb application-pdf)
31-03-2021
4447 Telangana NHAI – RO Hyderabad – PIU Hyderabad– Proposal for Permission for laying of Mission Bhagiratha Pipeline along National Highway from Km.61+453 to Km.65+730 (LHS), and from Km.66+010 to Km.66+512 (LHS) for a total length of 4779 m through Open trench laying (except HDD at 4 cross roads at Km.66+010, Km.63+860, Km.62+600 and km.61+980 ) on Hyderabad -Bangalore section of NH-44 in the State of Telangana (1.26 Mb application-pdf)
31-03-2021
4448 Telangana NHAI – RO Hyderabad – PIU Hyderabad– Proposal for Permission for laying of Mission Bhagiratha Pipeline along National Highway from Km.67+100 to Km.66+000 (RHS), and from Km.66+000 to Km.65+730 (LHS) through Open trench laying and HDD crossing at Km. 66+0000 across the National Highway on Hyderabad -Bangalore section of NH-44 in the State of Telangana (1.35 Mb application-pdf)
31-03-2021
4449 Chhattisgarh Permission for laying of underground pipeline across the NH-63 at various chainages from Km.288.00, Km.290.80, Km.291.80, Km.292.80, Km.297.80, Km.300.60, Km.300.80 on Bhopalpatnam – Jagdalpur road at Block-Bhaopalpatnam, Distt-Bijapur State-Chhattisgarh (788.56 Kb application-pdf)
31-03-2021
4450 Maharashtra NHAI-PIU-Kolhapur - Four laning of Sangli-Solapur (Package-!, Sangli-Borgaon) section of NH-166 from existing km 182.195 (Design chainage km 182.556) to existing km 219,956 (Design Chainage Km 224.000) of length 41.444 Km in the state of Maharashtra on Hybrid Annuity Mode - Submission of proposal for grant of permission for laying of MJP pipelines along NH-166 in Arjunwad Road to Tasgaon-Mhaisal Road (Km 191+400 to 198+000 of NH-166) (914.71 Kb application-pdf)
31-03-2021

Pages