Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
4421 Bihar Two Laning with Paved shoulder of Chhapra-Rewaghat-Muzaffarpur section of NH-102 from Km 1+300 to Km 74+200 (Existing Chainage) and Km 1+300 to Km 74+359 (Design Chainage), (Total Design length 73.049 Kms.) in the state of Bihar under NHDP- IV on EPC mode: Proposal for Approval for NHAI Road Crossing at AP-24-AP-24A (2.81 Mb application-pdf)
22-10-2021
4422 Tamil Nadu NHAI - RO Madurai – Highway Administration - Layining 8”dia Steel & 125mm’’ dia PE Gas Pipeline by M/s Adani Gas Ltd, Ahmedabad (i) along from Km 23.031 to Km 23.273 on LHS and (ii) across at Km23.273 on Nagapattinam - Thanjavur section of NH-83 (Old 67) in the state of Tamilnadu (472.10 Kb application-pdf)
22-10-2021
4423 Tamil Nadu NHAI, PIU - Viluppuram - Proposal for laying of underground Optical Fiber Cable (OFC) on NH-45 along the road from Km.185+770 to Km.185+950 LHS, also a crossing at Km.185+770 RHS-LHS, for a total length of 180m along the NH and one crossing across NH by M/s. Vindhya Telelinks Limited, Telegana - Approval Requested (1,005.38 Kb application-pdf)
22-10-2021
4424 Tamil Nadu NHAI, PIU - Viluppuram - Proposal for laying of underground Optical Fiber Cable (OFC) on NH-45 along the road from Km.178/600 to Km.178/650 (RHS), Km.181/000 to Km.181/600 (RHS) & Km.191/300 to Km.191/450 (RHS) and also crossing at Km.178/600 (RHS-LHS), Km.181/000 (RHS- LHS) and Km.191/450 (RHS-LHS) for a total length of 800m along NH and 3 Nos. of crossing across NH by M/s. Vindhya Telelinks Limited, Telegana - Approval Requested (1.05 Mb application-pdf)
22-10-2021
4425 Tamil Nadu NHAI - PIU - Puducherry - Four laning and strengthening of Pondicherry - Tindivanam Section of NH-66 (Km 0/000 - Km 37/920) in the State of Tamil Nadu under NHDP-III - Permission to lay underground Optical Fibre Cable (OFC) NH-66 Road (Pondicherry to Tindivanam Section) along the road from Km.0/000 to Km.01/200 (LHS) and also crossing at Km.01/200 in the UT of Puducherry, National Highways, Pondicherry (6.75 Mb application-pdf)
22-10-2021
4426 Tamil Nadu NHAI, PIU, Puducherry - Four laning of Poondiyankuppam (Km.67/000) to Sattanathapuram (Km.123/800) Section of NH-45A (New NH-32) on HAM under NHDP Phase-IV in the state of Tamil Nadu - Permission for laying of underground 8” dia.(219mm) Carbon Steel & 125mm dia. MDPE gas pipeline along & across NH-45A (Villupuram - Puducherry - Nagapattinam ) from Design Ch: 62+875 to 644650 (Existing Ch: 72+875 to 74+650 LHS), Design Ch:66+347 to 67+350 (Existing Ch: 76+347 to 77+350 LHS), Design Ch: 67+350 to 68+380 (Existing Ch: 77+350 to 78+380 RHS) & 1 Nos of road crossing at Design Ch:67+350 (Existing Ch:77+350 from LHS to RHS) to develop city gas distribution network in Cuddalore and its surrounding area (3.50 Mb application-pdf)
22-10-2021
4427 Maharashtra Proposal of Permission to laying Optical Fiber Cable (OFC) along Rajura - Korpana - Gadchandur - Bhamni - Gondpipri - Ashti Road section of NH-353 B -B from Km, 33/00 to Km, 55/00, 60/00 to Km, 62/00, 67/00 to Km, 73/00, 75/00 to Km, 90/00, in the state of Maharashtra (705.25 Kb application-pdf)
20-10-2021
4428 Maharashtra Proposal of Permission to laying Optical Fiber Cable (OFC) along Gadchiroli - Alapalli - Sironcha road section of NH - 353 C from Ch, in Km, 201/00 to 225/00 Lagan - Alapalli RHS 241/00 to 290/00 Nandigram - Rompalli RHS 292/00 to 321/000 Tekada - Tamtala - T point - RHS 263/00 to 289/00 Repanpalli - Regunta T point LHS in the state of Maharashtra (745.45 Kb application-pdf)
20-10-2021
4429 Maharashtra Proposal of Permission to laying Optical Fiber Cable (OFC) along Murumgaon - Dhanora - Gadchiroli - Mul - Chandrapur - Warora - Wani - Karanja Road section of NH-930 from Ch. Km, 246/00 to Km, 273/00, (Total Length: 27.00 Km,) in the state of Maharashtra (698.22 Kb application-pdf)
20-10-2021
4430 Himachal Pradesh Construction of 220 KV/DC Transmission line proposed 132/220 KV GIS Sub Station at Dehan (Patti) to 440 KV/PGCL, Sub Station at Kankari Distt Hamirpur-Proposal for NH-03 Crossing (916.63 Kb application-pdf)
18-10-2021

Pages