Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
3811 Andhra Pradesh RO - Vijayawada - Permission for laying of OFC Cable using HDD Method on NH-16 between KIMS Hospital Jn Km.718/600 to Akkireddy palem Jn Km.719/500 (900 Mts), Water Tank Jn Km.719/600 to Mindi Jn Km.720/300 (700 Mts), Sunrise Hospital Jn Km.721/800 to Celest Jn Km.722/800 (1000 Mts), Vadlapudi Rly Bridge Km.724/650 to Pavan Sai Hospital Jn Km.725/100 (450 Mts), near Toll Plaza Km.727/900 to Parveen Marble Km.729/000 (1100 Mts) and across at Km.718/600 (60 Mts), Km.722/000 (60 Mts), Km.722/800 (60 Mts), Km.727/900 (60 Mts), Km.729/600 (60 Mts) for a total length of 4450 Mts in Visakhapatnam District of Andhra Pradesh State (8.59 Mb application-pdf)
22-04-2022
3812 Andhra Pradesh RO - Vijayawada - 6 laning of Chilakaluripet - Vijayawada section of NH-5 - M/s. Jio Digital Fibre Private Limited - Permission for laying Optical Fiber Cable(OFC) along the road on LHS from Km. 428/100 to Km. 430/100 for a length of 2000mts on Chilakaluripet - Vijayawada section of NH-16 near DGP office & Mangalagiri Mandal, Guntur District, Andhra Pradesh (17.89 Mb application-pdf)
22-04-2022
3813 Uttarakhand Balance work of 4-laning of Haridwar-Dehradun Section from Haridwar Design Ch. 209+100 to Design Ch.216+824 of NH-58 and from Design Ch. 188+324 to Laltappar Design Ch.181+100 of NH- 72 (Pkg-l) (4.41 Mb application-pdf)
22-04-2022
3814 Tamil Nadu NHAI - PIU - Puducherry - N/08019/04001/TN- Four Laning of Sattanathapuram to Nagapattinam Road (Design Ch: 123+800 to Km 179+555) Section of NH45A (NEW No.NH32) in the State of Tamil Nadu NHDP Phase-IV on Hybrid Annuity Mode - Request for permission to lay Ennore -Thiruvallur - Bengaluru - Puducherry - Nagapattinam - Madurai - Tuticorin R-LNG Pipeline along with Optical Fiber Cable (OFC) across NH-45A by Horizontal Directional Drilling Method (HDD) Km. 140+550 (1.06 Mb application-pdf)
22-04-2022
3815 Tamil Nadu NHAI - PIU - Puducherry - N/08019/01001/TN- Four-Laning of Viluppuram - Puducherry section of NH 45A (New NH 332) from Km 0.000 to Km 29.000 (Design Chainage) under Bharatmala Pariyojana Phase | (Residual NHDP IV works) on HAM in the State of Tamil Nadu and Union Territory of Puducherry - Permission for laying of Gas Pipeline (200mm dia CS Pipe) M/s. East Coast Natural Gas Distribution Pvt. Ltd from Km. 20.100 to 29.450 RHS (Total length 9350m) along NH45A (Villupuram to Nagapattinam Road) in Puducherry U.T (1.10 Mb application-pdf)
22-04-2022
3816 Haryana Proposal for grant of permission for laying of Electric Cable across NH-48 crossing at Ch. 44.100 for implementation of Delhi-Gurugram-SNB Regional Rapid Transit System (RRTS) Corridor by M/s. NCRTC in the state of Haryana (5.02 Mb application-pdf)
22-04-2022
3817 Rajasthan Proposal for grant of ROW permission for laying of OFC from Nainwa Gate to Mendi along from Km. 225+575 to km, 255+400 for total section of 29.825 km. length along Gulabpura-Uniyara section of NH- 148D in the state of Rajasthan by M/s. Jio Digital Fiber Pvt. Ltd. (5.07 Mb application-pdf)
22-04-2022
3818 Karnataka Proposal seeking permission for laying of OFC cable along NH 367 from Kukanur Km 14.500 to Sanganahalu Km 28.500 (RHS) for a total length of 14.00 Kms and 3 no crossings at Km 14.600, Km 22.120 & Km 23.360 through HDD method by M/s. Telesonic Networks Ltd. (31.84 Mb application-pdf)
21-04-2022
3819 Tamil Nadu NHAI - PIU, Salem - Proposal of laying of Underground water pipe line for agriculture purpose by open excavation along the NH-7 from Km 217/992 to Km 218.693.80 - 701.8m (RHS), Km 218,693.80 to Km 219.192.00 - 498.2m (LHS) and across the road by HDD Method at Km 218/693.80 - 60m (RHS to LHS), by Mr.V.Sundaresan S/o. R.Varadharaj, Komarapalayam (Po), Mallur, Rasipuram Taluk, Namakkal District - Approval requested (1.24 Mb application-pdf)
21-04-2022
3820 Tamil Nadu NHAI - PIU, Salem - Proposal for laying of underground water pipe line along the NH-544 from Km 74/222 to Km 74/429 on RHS and across the road by HDD Method at Km 74/429 - 58.50m by Mrs.Dr.Thavamani Devi Palanisawami, Coimbatore - Approval requested (1.14 Mb application-pdf)
21-04-2022

Pages