Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
3831 West Bengal Submission of proposal for laying of GAIL's 24" dia Barauni-Guwahati Natural Gas Pipeline along with 40mm dia OFC Duct/ Cable across NH-31 at km 755.256 in village Dauwaguri, Block- Mathabhanga, District- Coochbehar in the State of West Bengal- initial permission (682.36 Kb application-pdf)
02-11-2021
3832 Odisha Permission for laying of 12" dia Natural Gas Pipeline along with 40 mm OFC by standard HDD method across National Highway-326A at km 100/400 at Village-Kathalkaitha, Tehsil-Paralakhemundi, Dist-Gajapati in the state of Odisha (2.06 Mb application-pdf)
02-11-2021
3833 Maharashtra NHAI-PIU-Kolhapur- Four Laning of Satara - Kolhapur to Maharashtra State Border Section of NH-4 from Km 592.240 to Km 725.000 in the State of Maharashtra- Permission for Excavation, lowering, laying and jointing 11 KV, 300 Sq.mm x 3 core Aluminium armored cable parallel to service road of NH-4 from Shiroli MIDC Branch road to Noor Mohmad Masjit (near Kolhapur steel) at Km 618.950 to Km 620.120 (939.57 Kb application-pdf)
02-11-2021
3834 Maharashtra NHAI-PIU-Kolhapur- Four Laning of Satara - Kolhapur to Maharashtra State Border Section of NH-4 from Km 592.240 to Km 725.000 in the State of Maharashtra- Permission for laying of 33 KV underground cable for crossing at National Highway NH-48 near Perle, Tal-Karad, Dist-Satara (877.88 Kb application-pdf)
02-11-2021
3835 Gujarat Six Laning from existing Km. 494+410 to existing Km. 509+550 of NH-8 in the state of Gujarat on EPC Mode under NHDP Phase-V (Package- VII). - Proposal for ROW permission for laying 8” Dia Steel Gas Pipeline across NH-48 at Km 541+100 on Mota Chiloda to Nana Chiloda section of NH-48 in the state of Gujarat (1.69 Mb application-pdf)
01-11-2021
3836 Jharkhand (i). ROW permission for 39 Km laying Optical Fiber Cable in km. 320 to Km. 334 & Km. 334 to Km. 336 & Km. 377 to Km. 400 in NH-2. (ii). ROW permission for 2.350 Km laying Optical Fiber Cable from M.S. 356/800 to M.S. 359/150 in NH-2 (121.74 Kb application-pdf)
01-11-2021
3837 Kerala NHAI-RO Kerala-4-laned Walayar-Vadakkancherry (Km.182+250-Km.240+000) section of NH-544 on BOT(Toll basis)-O&M Stage and 6 Laning of Vadakkanchery-Thrissur (Km.240+000-Km.270+000) of NH-544 on BOT(Toll) basis-Under construction-Laying of OFC on 40mm HDPE duct in between Km.235+120 to Km.237+500(LHS) of NH544 for a length of 2.080Km by M/s Telesonic Network Ltd. (Airtel) (859.45 Kb application-pdf)
01-11-2021
3838 Telangana NHAI – RO Hyderabad – PIU Mancherial–Proposal for laying of Optical Fiber Cable from Km.42+000 to Km.68+522 (RHS), from Km.72+000 to Km.84+650 (RHS), Km.87+570 to Km. 90+030 (RHS), from Km.91+240 to Km.92+450 (RHS), From Km.49+975 to Km.55+900 (LHS), from Km.62+960 to Km.62+980 (LHS), from Km.68+050 to Km.68+522 (LHS), Km. 71+700 to Km.72+000 (LHS), from Km.90+040 to Km.91+240 (LHS), along the NH-363 (four laning stretch), from Km.315+358 to Km.31+430, from Km. 315+358 to Km. 317+900 (RHS), from Km.317+900 to Km.319+185 (LHS) on the existing NH-363 by Open trench Methodology and Highway crossings at Km.46+350, Km.47+650, Km.49+965, Km.50+100, Km.54+200, Km.54+800, Km.55+900, Km.58+100, Km.62+950, Km.65+080, Km.67+340, Km.68+000, Km.68+522 (LHS side and RHS side), Km.69+245, Km.72+000, Km.76+300, Km.83+900, Km.84+650, Km..88+500, Km.90+030, Km.90+200, Km.91+240, Km.92+450, Km. 316+370 (existing NH-363), and Km.317+900 (existing NH-363 across the Repallewada to TS/ MH border of NH-363 using HDD method in the State of Telangana (5.84 Mb application-pdf)
01-11-2021
3839 Telangana NHAI – RO Hyderabad–Proposal for laying of Optical Fiber Cable from Km.12+000 to Km.19+410 (RHS), from Km.19+410 to Km.27+533 (LHS), Km.30+025 to Km.31+600 (LHS), from Km.31+660 to Km.42+000 (RHS), along the NH-363 (four laning stretch), from Km.251+900 to Km.252+600 (LHS), Km.252+606 to Km.258+418 (RHS) on the existing NH-363 by Open trench Methodology and Highway crossings at Km.11+600, Km.12+766, Km.14+240, Km.14+250, Km.17+100, Km.17+110, Km.19+410, Km.23+840, Km.30+025, Km.31+600, Km.34+465, Km.36+010, Km.38+035, Km.38+663, Km.39+150, Km.39+195, Km. 252+606 (existing NH-363), and Km.273+951 (existing NH-363) across the Repallewada to TS/ MH border of NH-363 using HDD method in the State of Telangana (4.26 Mb application-pdf)
01-11-2021
3840 Uttar Pradesh Permission for laying of underground Gas Pipeline (8" dia of Steel Pipe) and 125mm dia MDPE Gas Pipeline by HDD/Trenching Method of M/s Indraprastha Gas Limited from Old Ch. 31+700 to Old Ch. 37+200 along Right Hand Side (RHS) of the National Highway. The total section length for ROW applied is 5.5km on along Panipat-Shamli Road, National Highway, New NH-709AD (Old SH-12) in the State of Uttar Pradesh (5.37 Mb application-pdf)
29-10-2021

Pages