Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
3801 West Bengal Permission for laying NRL's proposed 26" dia (660mm) Crude Oil pipeline encased with 32" dia (813mm) casing pipe alongwith 6" dia (133mm) OFC duct / cable, as an integral part of crude oil pipeline crossing across the National Highway - 6, by Horizontal Borring Method at NH chainage 118+254 Km at village Dakshin Markandapur - 468, PS - Kharagpur-II, District - Paschim Medinipur, in the state of West Bengal (813.62 Kb application-pdf)
26-04-2022
3802 West Bengal Proposal for laying of underground Water Pipeline along and across NH-19 (Old NH-2) at Mouza - Anjirbagan & Lakurdi, PS - Burdwan, Dist - Purba Bardhaman State - West Bengal. (a) Two nos 450 mm dia DI Pipe through 650 mm MS casing pipe from Km 562.585 to Km 562.195 (RHS) across at Km 562.195 (RHS to LHS) & from Km 562.195 to Km 562.585 (LHS). (b) Two nos 500 mm dia DI pipes through 700 mm dia MS Casing pipe across from Km 563.812 (RHS) to Km 563.890 (LHS) (832.94 Kb application-pdf)
26-04-2022
3803 Assam Construction of 4 laning of NH-54E fram Km. 300.760 to Km. 275.000 of Silchar to Balachera Section of Assam, “Civil Contract Package No. EW-Il AS-01” Proposal for grant of permission for laying optical fibre cable fram Km. 300.760 to Km. 297.160 - In Principle approval (644.24 Kb application-pdf)
25-04-2022
3804 Arunachal Pradesh Proposal of NH-13 Highway Crossing Clearance for Construction of 132kV D/C Roing-Chapakhowa Transmission Line under NERSS-X between A/P33/0 & 34/0 in Arunachal Pradesh (582.37 Kb application-pdf)
25-04-2022
3805 Delhi Development of 6 lane Delhi-Meerut Expressway (DME) & 8 laning of NH-24 from Nizamuddin Bridge to UP Gate (Existing Km. 0.000 to existing Km. 8.360 in NCT of Delhi on Hybrid Annuity Mode. Permission for laying of underground ducgt line (40mm dia) and OFC line of (IPCON international (p) Ltd. From (0+000 to Ch. 3+740) total section length for ROW applied is 3740M along (Delhi-Ghaziabad Road) National Highway No. NH-09 (Old NH-24) in the state of Delhi (3.90 Mb application-pdf)
25-04-2022
3806 Gujarat Four/Six-laning of Gandhidham (Kandla)-Mundra Port Section of NH-8A (Extn.) (Approx. Length of 71.400 Km) in the State of Gujarat under NHDP phase-lll through PPP mode on OBFOT basis in the state of Gujarat. - Proposal for ROW Permission for Laying Proposed 8”dia steel gas pipeline along & across NH-8A Extn. (Koday-Pragpar) at Km 57+300 to Km 57+813 (LHS) and Km 57+077 to Km 57+813 (RHS) from Zero Point Circle to Ashapura Minechem & crossing at Km 57+813 in Mundra Taluka of Kutch Dist. of Kutch in state of Gujarat (1.45 Mb application-pdf)
25-04-2022
3807 Gujarat Proposal seeking ROW permission for laying 30” dia Crude Oil Pipeline (Mundra-Kachchh, Gujarat to Rajasthan Refinery-Pachpadra, Barmer, Rajasthan) along with OFC across to proposed NH-341 at Km 34+276 in District Kutch in the state of Gujarat (1.39 Mb application-pdf)
25-04-2022
3808 Andhra Pradesh Proposal for Permission for faying Gas pipeline of 6” dia. Steel pipeline by M/s AG&P Gas Pvt. Ltd. along the NH-716 road from km 124/800 to km 126/550 (LHS) near Sub-Jail YSR Statue circle in Kadapa District for a total length of 1.670kms in YSR Kadapa District in the State of Andhra Pradesh (17.92 Mb application-pdf)
25-04-2022
3809 West Bengal Submission of proposal for RoW permission for laying of OFC through underground (HDD) method from km 14.400 (Airport 2.5 No Gate) to km 23.203 on NH-34, Total length-8.842 km of Telesonic Networks Ltd. in West Bengal (679.13 Kb application-pdf)
25-04-2022
3810 Andhra Pradesh RO - Vijayawada - Permission for laying of OFC Cable using HDD Method on NH-16 between yendada Petrol Bunk Jn Km.697/200 to Indira Nagar Arch Km.699/900 (2700 Mts) (RHS), Visalaxi Nagar Jn Km.700/500 to HanumanthawakaJn Km.700/800 (300 Mts) (LHS), Krishna Temple Km.702/330 to IsukathotaJn Km.702/470 (140 Mts) (LHS), NAD Jn Km.713/850 to KIMS Hospital Jn Km.718/600 (4750 Mts) (LHS), NAD Jn Km.713/850 to Kakani Nagar Jn Km.714/700 (850 Mts) (RHS) and across at Km.697/200 (60 Mts), Km.702/470 (60 Mts), Km.715/600 (60 Mts) for a total length of 8920 Mts is Visakhapatnam District of Andhra Pradesh State (8.69 Mb application-pdf)
22-04-2022

Pages