Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
2851 Gujarat Proposal seeking ROW permission for crossing NH-113 at Km 238+086 between Jhalod to Dahod section near Village-Limdi for laying Drinking Water Supply Pipeline, Taluka Jhalod, District-Dahod in the State of Gujarat (2.49 Mb application-pdf)
15-05-2023
2852 Gujarat Four laning of Ahmedabad to Godhra Section of NH-47 from Km. 4.200 to 122.420 in the State of Gujarat on DBFOT Basis under NHDP Phase-III (2.57 Mb application-pdf)
15-05-2023
2853 Karnataka Proposal seeking permission for laying of 110KV Underground Electrical Cable along the road from Km.45/810 to Km.46/740; Km.46/812 to Km.46/827; Km.46/929 to Km.46/942 (RHS) & Km.47/025 to Km.47/789; Km.47/891 to Km.47/906; Km.48/038 to Km.48/137 (LHS) by Open Trench Method and from Km.46/740 to Km.46/812; Km.46/827 to Km.46/929(RHS); Km.47/789 to Km.47/891; Km.47/906 to Km.48/038; Km.48/137 to Km.48/205 (LHS) & across the road at Km.45/800 & Km.47/025 by Trenchless Method with a provision of duct 2.60m X 1.65m in 6 locations on Madurai–Ramanathapuram section of NH 49 road (986.39 Kb application-pdf)
12-05-2023
2854 Uttar Pradesh Request for grant of Right of Way permission to lay Optical Fiber Cable along the route from Km. 52.700 to Km. 58.100 on NH-34. Total Section length ROW applied for 5.400 Km. (Sajeti) as per attached drawing in the State of Uttar Pradesh (3.34 Mb application-pdf)
12-05-2023
2855 West Bengal Permission for laying 10 inch dia underground natural gas steel pipeline along NH-34 from Paschim Mahadebpur Ch. 331.400 to Narayanpur More Malda Ch. 394.979 for a total length of 63.57 Km in Uttar Dinajpur & malda District of West Bengal State of NH-34 (1.52 Mb application-pdf)
12-05-2023
2856 Uttar Pradesh Request for Right of Way permission for laying/crossing of Electrical Cable/ HDPE Pipe on NH-19 & road crossing at Km. 489.115, Km. 491.280, Km. 491.042 & Km. 505.660 on Kanpur–Fatehpur Section in the State of Uttar Pradesh (3.58 Mb application-pdf)
12-05-2023
2857 Madhya Pradesh Proposal for Laying of Water Pipeline for Construction of Pench Micro Complex-2 Section of NH-547 (1) Km.- 99.900 Near Village-Jhirri Towards Narsinghpur (2) Km.- 98.400 Near Bangaon Circle, Towards Narsinghpur, District-Chhindwara in the State of Madhya Pradesh (10.01 Mb application-pdf)
11-05-2023
2858 Haryana Issue NOC for laying of drinking water pipeline under surface water project Patrewala, Tehsil-Abohar, District-Fazilka on Abohar-Sri Ganganagar Road on RHS Ch. 16.580 to 18.935 meter (open trench method) one crossing on km18.935 with HDD method =1X44 meter = 44 meter on the boundary of NH-62 (village Giddranwali to village Maujgarh) under NABARD IJJM (849.43 Kb application-pdf)
10-05-2023
2859 Haryana Issue NOC for laying of drinking water pipeline under surface water project Patrewala, Tehsil-Abohar, District-Fazilka on Malout-Abohar road on RHS Ch. 58.645 to 62.365=3720 meter (open trench method) one crossing on km 62.365 with HDD method =1X44 meter=44 meter on the boundary of NH-07 (village Balluana to village Bahawal Bassi) under NABARD IJJM (800.43 Kb application-pdf)
10-05-2023
2860 Haryana Issue NOC for laying of drinking water pipeline under surface water project Patrewala, Tehsil-Abohar, District-Fazilka on Abohar-Sri Ganganagar Road on RHS Ch. 6.688 to 9.668 meter (open trench method) two crossing on km 8.523 & Km. 9.668 with HDD method =2X44 meter=88 meter on the boundary of NH-62 (village Sayadwala to village Daulatpura) under NABARD IJJM (787.09 Kb application-pdf)
10-05-2023

Pages