Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
3061 Odisha Rehabilitation & Upgradation of Cuttack- Angul section of NH-42 (New NH-55) to 4-lane in the Stale of Odisha under NHDP-lIl on EPC Mode Package-Il- Permission for laying of 33KV ubderground line on NH-55 km. 66+150 to km. 67+760 to energize 33/11 kv sub-station newly construction at village Badandha under ODSSP scheme by OPTCL (1.60 Mb application-pdf)
16-02-2023
3062 Uttar Pradesh NOC for crossing of 11 kV Feeder line through underground cable at Chainage 51.101 & Erection of Poles from Ch.51.010 to Ch.51.320 (LHS) & from Ch.51.010 to Ch.51.250 (RHS) on NH-24 (New NH-09) for electrical connection to DFFCIL Crossing station & New Hapur Station (4.02 Mb application-pdf)
16-02-2023
3063 Tamil Nadu Request for permission to lay underground Optical Fibre Cable (OFC) on Chengapalli to Walayar Section of Salem–Cochin Road between km 137/150 to km 138/120 (LHS) and Road Crossing @ km 137/150 on NH-544 (474.63 Kb application-pdf)
15-02-2023
3064 West Bengal NOC permission proposal for laying water pipeline along and across of NH-110 (Old NH-55) from km 0.700 to km 8.735 in respect of water supply scheme within Darjeeling Municipality under “AMRUT” in the State of West Bengal (84.31 Kb application-pdf)
15-02-2023
3065 Uttar Pradesh Proposal for permission for laying of Carbon Steel Underground Gas Pipeline along to NH-19 for providing connectivity to Nitish Yadav CNG Station near Rupaspur, District-Firozabad (from Ch.251+940 (19+940) km to Ch.255+660 (23+660) km.) in the State of Uttar Pradesh (7.11 Mb application-pdf)
15-02-2023
3066 Uttar Pradesh Permission for crossing of 02 nos. 11 KV, XLPE Cable through (160mm dia pipe) HDD Method Gyondi Feeder 33/11 KV Crossing of NH-34 at Km.113.7 & 114.4 underpass near Khanna, Mahoba in the State of Uttar Pradesh (6.34 Mb application-pdf)
15-02-2023
3067 Uttar Pradesh Permission for crossing of 02 Nos. 11 KV XLPE cable through (160mm dia pipe) HDD Method for Agriculture Consumers and associated works in District-Hamirpur for 33/11 KV crossing of NH-34 at Km. 77.1 & Km. 97.4 near Nazarpur underpass in District-Hamirpur in the State of Uttar Pradesh (6.29 Mb application-pdf)
15-02-2023
3068 Uttarakhand Proposal of M/s GAIL Gas Ltd. seeking permission/NOC for the laying work of 4" dia Steel natural gas pipeline along the road from km. 207+150 (Dudhadhari Chowk) to km. 208+625 (Tirupati Balaji Sham) on LHS of NH-58 (NH-34) in a total length of 1475m by HDD method (3.23 Mb application-pdf)
14-02-2023
3069 Odisha Rehabilitation & Upgradation of existing two lane to four lane standards from End of Kamakhyanagar Bypass to Duburi section of (Km.335+946 to Km.388+382) of NH-53 in the State of Odisha under NHDP-III- Permission for erection of 33 KV Transmission line along the NH-53 for Moga Lift Irrigation Projects, DMF Cluster (1.62 Mb application-pdf)
14-02-2023
3070 Uttar Pradesh Proposal for NOC for laying of Underground electrical cable for crossing on Delhi–Kanpur road, NH-19 (old NH-02 ) in Km. 299, Chainage 298-095 between near 132/23 KV S/S Rainagar & 33/11KV & Balrai Km.306, Chainage 305+186 between 132/33 KV S/S Rainagar & 33/11 KV Jugaura near Jaswant Nagar in the State of Uttar Pradesh (4.74 Mb application-pdf)
14-02-2023

Pages