Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
2301 Odisha Permisssion for laying of 273 mm OD X 6.4 mm WT CS Natural Gas Pipeline along with 40mm OFC duct along NH-53 from chainge 0.000 to km. 21.693 km. from Chandikhole to Kusunpur and across at chainge 0.767 km. near sunguda village and at chainge 15.400 near Nalipur Village on NH-53 (1.91 Mb application-pdf)
13-12-2023
2302 Bihar Permission for laying & crossing of Environment Friendly Natural Gas Steel and MDPE pipeline along and across National Highway with OFC in Chakiya Muzaffarpur section of NH-28 (New NH-27) & Darbhanga OMT-20 section of NH-57 (New-27) in LHS in Muzaffarpur district covering length 23.470 Km. (4.75 Mb application-pdf)
12-12-2023
2303 Haryana NOC for laying of 150mm, 200mm & 250mm diameter water supply pipeline (DI pipe along the Highway & MS pipe with cement lining & encasing for crossings) for the project of “Public Health Engineering Sub-Division, Badhra, Charkhi Dadri” along NH-334B from Km. 197.800 to 203.710 and from Km. 214.400 to 219.050 (Total Length=10560m) with crossings at Km. 208.158 & 214.400 on NH-334B in Tehsil Badhra, District-Charkhi Dadri (Haryana) (441.93 Kb application-pdf)
12-12-2023
2304 Haryana Proposal for laying of 6” NB Carbon steel gas pipeline from Km. 6.460 to Km. 6.550 (LHS) & from Km. 8.000 to Km. 8.040 (LHS) and highway crossings at Km. 5.600, Km. 6.550 & Km. 8.000 through existing utility ducts of 600mm on NH-444A in district of Ambala in the State of Haryana (388.18 Kb application-pdf)
12-12-2023
2305 Haryana Proposal for laying of 8” Carbon steel gas pipeline of M/s IGL from Km. 134.400 to Km. 151.000 (LHS) and highway crossings of 4” dia. at Km. 134.400 & Km. 151.000 through HDD method on NH-1 (new NH-44) in District of Karnal in the State of Haryana (393.29 Kb application-pdf)
12-12-2023
2306 Maharashtra Proposal for laying of 11 KV 300 sqmm, 3-Core XLPE underground HT cable across the NH-44 at chainage in km 99.100 on Nagpur-Hyderabad section near Pipari Village(Substation), Ta. Hinganghat, District-Wardha for existing supply near 11 KV MEL feeder connection (1.13 Mb application-pdf)
11-12-2023
2307 Jharkhand Proposal for permission for laying of GAIL’s 125 mm dia MDPE & 4” steel pipeline for Ranchi City Gas Distribution Network along NH-75E (410.25 Kb application-pdf)
11-12-2023
2308 Jharkhand Proposal for permission for crossing of Nuadiha-Chhatarpur Transmission Line at km 57.838 of NH-98 (5.91 Mb application-pdf)
11-12-2023
2309 Maharashtra Six Laning of Pune-Satara section of NH-4 from Km 725.000 to 865.350 (Length Km 140.350) in the State of Maharashtra to be executed as BOT (TOLL) on DBFOT pattern under NHDP Phase V- Proposal for grant of permission for laying water pipeline crossing at Km. 849+75 (Sus Mhalunge) across NH-48 (2.29 Mb application-pdf)
11-12-2023
2310 Maharashtra Proposal for requesting permission for laying optical fiber cable and 40 mm 2 HDPE Pipe from Km. 00/000 to Km. 11/400 (Talegaon Dabhade to Dehu Cross Road) on LHS along NH-548 D (1.52 Mb application-pdf)
11-12-2023

Pages