Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
2281 Tamil Nadu Laying of water supply pipeline by crossing the NH road at Km.117/989 of Trichy Bypass (connecting Thuvakudi–Mathur–Panjappur) on NH-83 (Old NH No.-67) (14.49 Mb application-pdf)
18-12-2023
2282 West Bengal ROW Permission for laying 26" Dia (660 mm) Crude Oil Pipeline with 32 inch Casing Pipe along with 40 mm dia Optical Fiber Cable with 89 mm MS Pipe through HAB Method across NH-114 at Km 62.647 under NH Division-XII for proposed Paradip-Numaligarh Crude Oil Pipeline Project (73.32 Kb application-pdf)
18-12-2023
2283 Maharashtra Submission of revised Proposal with correction of Single circuit line along NHAI & 11KV UG cable for road crossing on NH-65 road for location – 1) Near Tandulwadi Bus Stand for 11KV Tandulwadi feeder Ch. 268/100. 2) Near Tandulwadi Bus Stand for 11KV Sangdari feeder Ch. 268+100. 3) Near Bharat Petrol Pump for 11KV Boramani feeder Ch. 265/750. 4) Near Bhagwati Agro Ch. 261/500 (2.27 Mb application-pdf)
18-12-2023
2284 Punjab Request for Right of Way (ROW) approval for installing Pole Infrastructure at Junctions on NH-44 (Pathankot Chowk, PAP Chowk, Gujja Peer Chowk, Lamba Pind Chowk, Sanjay Gandhi Nahar Pulli, Sanjay Gandhi T Point, Aman Nagar road near GP Tower T point, Rama Mandi Chowk and Paragpur Chungi in the State of Punjab (841.60 Kb application-pdf)
18-12-2023
2285 Haryana Permission for laying of 12 Carbon Steel Gas Pipeline Along/ Across the NH-07 from Abohar Bypass from Ch. 66+300 Km to Abohar Bypass (Ganganagar side) Section CH. 76+500 along LHS Approx. 10.200 Km. (1.32 Mb application-pdf)
15-12-2023
2286 Karnataka Proposal for approval of overhead Crossing of 400KV DC line Gadag-Narendra (New) solar power transmission line at Km 62.170 near Mushikeri village Gajendragad taluk, Gadag district of NH-367 Bhanapura-Gaddanakeri section in the State of Karnataka (1.52 Mb application-pdf)
15-12-2023
2287 Haryana Permission for laying of 12 Carbon Steel Gas Pipeline Along/ Across the NH-07 from Malout Bypass from Ch. 80+200 Km to Abohar Section CH. 58+400 Km. (New CH. 44+500 to CH. 66+300 Km) along LHS Approx. 21.8Km. (135.30 Kb application-pdf)
15-12-2023
2288 Haryana Permission for laying of 12 Carbon Steel Gas Pipeline Along/Across the NH-07 from Abohar Bypass from Ch. 66+300 Km to Abohar Bypass (Ganganagar side) Section CH. 76+500 along LHS Approx. 10.200 Km. (137.57 Kb application-pdf)
15-12-2023
2289 Haryana Permission for laying of 125mm Dia MDPE Pipeline for Dabwali PE connectivity Sirsa (A) Across NH Ch KM. 34/111, Km. 34/49 (B) Along NH CH KM 32/840 to 32/650 (LHS), KM. 32/840 to 33/665 (RHS), KM 32/980 to 33/569 (LHS), Km. 33/812 to 34/311 (LHS), Km. 33/705 to 34/500 (RHS) for NH-09 within RoU in Dabwali Village of Mandi Dabwali Thesil of Sirsa District falling under your jurisdiction (143.18 Kb application-pdf)
15-12-2023
2290 Uttar Pradesh NOC case for laying of Gas Pipe Line of “M/s. Indraprastha Gas Limited (IGL)” (4”Dia Carbon Steel Pipe) from Km. 33+000 RHS to Km. 36+235 RHS (Length 3235m) and One Crossing at Km. 36+235 (Length 90.0m), (Total Length 3325m) along Delhi-Meerut Expressway (NE3) (Dasna to Meerut Road), in the State of Uttar Pradesh (2.50 Mb application-pdf)
15-12-2023

Pages