Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
7121 Tamil Nadu Permission Proposal for laying underground Optical fiber cable along the NH from Km 214/800 - Km 220/900 (RHS), (Madurai- Tuticorin section) of NH 45B in the State of Tamil Nadu (539.39 Kb application-pdf)
14-03-2019
7122 Tamil Nadu Permission Proposal for laying underground Optical fiber cable along the NH from Km 225/100 to Km 246/150 RHS and across at Km 235/100, Km 240/000 (Trichy - Padalur section) of NH-45 in the State of Tamil Nadu (616.00 Kb application-pdf)
14-03-2019
7123 Tamil Nadu Permission Proposal for laying R-LNG Pipe underground Optical fiber cable along the NH across Km 214.065 (Trichy – Madurai section) of NH-45 in the State of Tamil Nadu (548.84 Kb application-pdf)
14-03-2019
7124 Punjab Proposal for Crossing of 800 KV HVDC Raigarh – Pugaluroverhead power line at chainage167.700 km near KG Satram Village of Shantipuram – Nalagampalli Section of NH-4 (321.25 Kb application-pdf)
14-03-2019
7125 Punjab Permission for laying of 33KV Transmission Line by UHBVN on Connecting link of NH-9 (Old NH-10) and NH-352 (Old NH-71) km 0.1 to km 9.1 (321.25 Kb application-pdf)
14-03-2019
7126 Tamil Nadu Permission for laying underground 150mm dia PVC pipeline NH-83 from Km 32/150 to 35/130(LHS) of Coimbatore-Karur-Tiruchirapalli-Nagapattinam road, at Thippampatty Village, Pollachi Taluk and Coimbatore district in the State of Tamil Nadu (240.34 Kb application-pdf)
14-03-2019
7127 Maharashtra Permission for laying and crossing water supply pipe line Amrut yojna jalgaon NH-06 (429.52 Kb application-pdf)
13-03-2019
7128 Haryana M/s Freedom Footwear Pvt. Ltd. At KM-42.300 (LHS) on NH-10(09) at Village Kasar Tehsil Bahadurgarh Distt - Jhajjar in The State of Haryana (428.08 Kb application-pdf)
11-03-2019
7129 West Bengal Proposal for crossing of NH-31 for Construction of 400 KV DC Alipur-Siliguri transmission line at km.669 to 670 (428.66 Kb application-pdf)
09-03-2019
7130 Arunachal Pradesh Proposal for Crossing of 800 KV HVDC Raigarh – Pugaluroverhead power line at chainage167.700 km near KG Satram Village of Shantipuram – Nalagampalli Section of NH-4 (6.94 Mb application-pdf)
08-03-2019

Pages