Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
4081 Madhya Pradesh Proposal for permission to lay optical fiber cable on NH-34 (part of SH-21) from Patan- Tendukheda- Rehti road km. 30+000 to km. 53+200 total section length ROW applied for 23.200 km in the State of Madhya Pradesh for M/s Telesonic Networks Limited Indore (405.59 Kb application-pdf)
06-08-2021
4082 Tamil Nadu Issue of No Objection Certificate and Access Permission for the proposed New Private Property – Commercial Building (Mr.D.A.M. Anbuchezhian & M.Jothiraman) abutting on LHS of NH-45 from Km 162/331.5 to Km 162/343.5 in S.No.269/2B2 of Viluppuram Village of Viluppuram Taluk & District in Tindivanam to Ulundurpet Section of NH-45- Proposal submitted for issuance of 2nd Extension of Time (414.57 Kb application-pdf)
06-08-2021
4083 Telangana Proposals for permission for laying of OFC by M/s Telangana Fiber Grid Corporation limited along NH365B from Ch. 0.000 to Ch. 5.480 of Jangaon Dudedda section for 5.48Km in the State of Telangana (881.83 Kb application-pdf)
05-08-2021
4084 Telangana Proposals for permission for laying of OFC by M/s Telangana Fiber Grid Corporation limited along NH-365B from Ch.0.000 to Ch.32.710 of Jangaon Tirumalgiri section for 13.790 Km in the State of Telangana (918.07 Kb application-pdf)
05-08-2021
4085 Telangana Proposals for permission for laying of OFC by M/s Telangana Fiber Grid Corporation limited along NH-365B from Ch.11.800 to Ch.25.530 of Jangaon Dudedda section for 13.790 Km in the State of Telangana (811.24 Kb application-pdf)
05-08-2021
4086 Punjab Permission for laying proposed Gas Pipeline of 8 inch Diameter Steel and 125 mm MDPE Gas Pipeline along from Km 112.750 to Km 113.900 (RHS), Km 113.900 to Km 143.538 (LHS), Km 143.538 to Km 147+000 and Km.147.000 to Km 152.300 (LHS) by open trench method and crossing at Km.113.900 (2 no), Km. 143.538 (2 no) and km 147.000 (2 no) by HDD method across NH-95 in Ludhiana Moga section Highway from Aligarh Village to Moga in District Ludhiana in the State of Punjab (209.50 Kb application-pdf)
05-08-2021
4087 Uttar Pradesh Proposal for crossing permission / NOC for laying 16 inch LPG Pipeline along with OFC Cable across NH-31 at Km. 5.700 near Mughalpur Village in the State of Uttar Pradesh (2.67 Mb application-pdf)
04-08-2021
4088 Uttar Pradesh Proposal for laying & Crossing of :- i. Section – 1: 8” dia Natural Gas Carbon Steel Pipeline along NH-119 Etawah-Chajeri (Left Side) from Ch.323+550 to Ch.355+840 (Near Reliance Petrol Pump Etawah to near Ajeetmal Bypass) = 32.29 Km. ii. Section – 2: 8” Dia CS Pipeline across NH-19 ( Etawah to Chakeri Road) at Ch.330.22 Km. approx. 0.06 Km. iii. Section – 3: 8” Dia CS Pipeline across NH-19 ( Etawah to Chakeri Road) at Ch.330.86 Km. approx. 0.06 Km (2.31 Mb application-pdf)
04-08-2021
4089 Gujarat Permission for the laying/install of Underground Natural Gas Pipeline of M/s. Gujarat Gas Ltd of 125 mm dia PE along NH-51 between Km 119/800 to Km 121/850 (Total project length is 2.050 Km) and 3 No of 4" dia steel through 10" dia casing Pipe at Km 121.850, Km 120.690, Km 119.800 in the State of Gujarat (229.34 Kb application-pdf)
03-08-2021
4090 Punjab Permission for Laying of Sewerage/ water supply pipeline of 24 inch diameter from Km.31.100 to Km.32.350 (RHS), from Km.32.350 to Km.32.870 (LHS) by open cut method across NH-07 (New NH-64 ) in Zirakpur-Rajpura section of Highway in District- Rajpura in the State of Punjab and 1 Crossing at Km.32.250 (LHS to RHS) by HDD method (520.52 Kb application-pdf)
03-08-2021

Pages