Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
3611 Gujarat Proposal for ROW permission for laying 12” dia Steel Natural Gas Pipeline to supply natural gas to village Khirai from our existing pipeline near Finstone Garinto in Village- Gala in Tal./Dist.-Morbi, Gujarat State-Pipeline laying parallel to NH-27 (Morbi- Samakhiyali Road) from (i) NH Ch.254/537 Km to 264/926 Km in (LHS) for a length of (L=10/389 Km) and from (ii) NH Ch.264/926 Km to 265/456 Km (RHS) for a length of (L=0/530 Km) along the pipeline route in District Morbi (1.54 Mb application-pdf)
19-01-2022
3612 Karnataka Proposal seeking Permission for laying of OFC cable from Km 141.00 to Km168.00 on RHS of NH-169 for a length of 27.00 Kms by M/s Jio Digital Fibre Private Limited (6.15 Mb application-pdf)
19-01-2022
3613 Karnataka Proposal seeking Permission for laying of OFC cable from Km 61,00 to Km75.00 on LHS of NH-73(Old NH-234) for a length of 14.00 Kms by M/s Jio Digital Fibre Private Limited (16.85 Mb application-pdf)
19-01-2022
3614 Gujarat Proposal for ROW permission for construction of 66KV S/C Dhareshwar-Jetpur B-Line, Near Village Pithadya, Taluka-Jetpur, District-Rajkot by laying of 66KV 1xCore 630 Sq. MM. (3+1) underground power cable, across NH-27 (8B) between Km 116 and Km 117, near 400 KV Jetpur S/S, Taluka-Jetpur, District-Rajkot in the state of Gujarat (1.53 Mb application-pdf)
18-01-2022
3615 Gujarat Proposal for ROW permission for 66KV D/C Wankaner-Jadeshwar Line with UGC Line crossing to NH-27 at Km 210+320 and laying parallel to NH-27 between Km 211+680 and Km 210+320 (Right side from increasing chainage and between Km 210+320 and Km 210+645 (Left side from increasing chainage) near village Wankaner Tal. Wankaner Dist. Morbi Projects under Kishan Suryoday Yojna scheme of GOG (1.54 Mb application-pdf)
18-01-2022
3616 Gujarat Six Laning of Surat-Dahisar Section of NH-8 from Km 263.000 to Km 502.000 (Length Km 239.000) in the state of Gujarat and Maharashtra executed as BOT (Toll) on DBFO pattern NHDP Phase V. Proposal for ROW permission for laying HVDC Underground Power Cables on NH-48 between Village-Shirsad to Dahisar Check Naka (Km 473+350 to Km 502+000) for proposed 1000MW, 320KV VSC Based HVDC Transmission System (1.57 Mb application-pdf)
18-01-2022
3617 Andhra Pradesh Permission for laying of OFC Cable using HDD Method along NH-16 between Law College Jn Km. 695/200 to Disha Police Station Km. 696/200, Ganesh Bar Km. 702/580 to Shivaji Palem Jn (NH) Km. 702/680 and Across at 691/770, 692/640, 694/260, 705/305, 706/320, 707/390, 708/700, 711/150, 712/200, 712/560, 713/330 Total length = 1760 Mts in Visakhapatnam District of Andhra Pradesh (13.09 Mb application-pdf)
18-01-2022
3618 Assam Permission for laying of 33kV Underground Cable in front of Teok 132/33 kV Grid Sub Station, Koliapani, Teok by APDCL, Nazira Electrical Division: Application for Grant of crossing permission at Km 485.672 of NH-37 (910.57 Kb application-pdf)
18-01-2022
3619 Assam Permission for laying of 32” Dia Casing Pipe (26” Dia Carrier Pipe) underground Crude Oil Pipeline along with Optical Fibre cable through HAB Method for the Paradip-Siliguri-Numaligarh Crude Oil Pipeline Project: Application for Grant of crossing permission at Km 408+952 of NH-37 (973.67 Kb application-pdf)
18-01-2022
3620 Assam Permission for laying of 14” Dia Casing Pipe (4” Dia Carrier Pipe) underground LPG Pipeline through Horizontal Boring Method for the LPG Dispatch Line of the lIOCL-Digboi Refinery: Application for Grant of crossing permission at Km 24.70 of NH-38 (952.39 Kb application-pdf)
18-01-2022

Pages