Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
3561 Gujarat Four/Six Laning of Gujarat/ Maharashtra Border - Surat - Hazira Port Section of NH-6 (approx. Length 131.500 Km) in the State of Gujarat under NHDP Phase III through PPP on DBFOT Basis. Proposal for ROW Permission for carrying out trenching work by HDD from Km. Parallel to Road 24.500 RHS and from O.P. Farm to Luthara Farm of NH- 53 in the state of Gujarat (1.51 Mb application-pdf)
08-02-2022
3562 Rajasthan Proposal for grant of permission for erection of 33KV line on tower along NH-758 (from Km. 67.100 to 70.00, RHS) for connection Executive Engineer (PHED) Chambal Pump Karoi from under construction 132 KV GSS (Near Karoi Bypass Bridge) by AVVNL (7.18 Mb application-pdf)
08-02-2022
3563 Telangana NHAI - RO Hyderabad - PIU Hyderabad-Proposal for laying of Optical Fiber Cable for a total length of 8.08 Km from Km,60+600 to Km.61+900 (RHS), & from Km.58+400 to Km.65+000 (LHS), along NH-44 and Highway crossings at km.60+700, Km. 60+725, & Km.64+400 by HDD methodology Hyderabad to Banglore section of NH-44 in the State of Telangana (7.16 Mb application-pdf)
08-02-2022
3564 Telangana NHAI - RO Hyderabad - PIU Nirmal-Proposal for laying of Optical Fiber Cable for a total length of 33.315 Km from Km.343+507 to Km.314+225 (RHS), Km.341+225 lo Km.341+790 (RHS), and from Km.341+790 to Km.373+762 (LHS), along NH-44 by Open trench Methodology and Highway crossings by HDD methodology at Km.341+790 on Nagpur to Hyderabad section of NH-44 in the State of Telangana (23.14 Mb application-pdf)
07-02-2022
3565 Telangana NHAI - RO Hyderabad - PIU Nirmal-Proposal far laying af Ontiral Fiber Cable for a total length of 2.793 Km from Km.373+762 to Km.376+090 (LHS), and from Km.376+090 to Km.376+495 (RHS), along NH-44 by Open trench Methadology and Highway crossings by HDD methodology at Km.376+090 on Nagpur to Hyderabad section of NH-44 in the State of Telangana (8.62 Mb application-pdf)
07-02-2022
3566 Telangana NHAI - RO Hyderabad - PIU Nirmal-Proposal for laying of Optical Fiber Cable for a total length of 17.099 Km from Km.290+263 to Km.295+295 (LHS),from Km.295+295 to Km.299+315 (RHS), and from Km.305+920 to Km.3131507 (RHS) along NH-44 by Open trench Methodology and Highway crossings by HDD methodology at Km.295+295 on Nagpur to Hyderabad section of NH-44 in the State of Telangana (15.86 Mb application-pdf)
07-02-2022
3567 Telangana NHAI - RO Hyderabad - PIU Sangareddy-Proposal for laying of Optical Fiber Cable for a total length of 8.673 Km from Km.66+192 to Km.67+317 (RHS), from Km.70+690 to Km.71+576 (RHS), from Km.71+576 to Km.73+463 (LHS), & from Km.74+978 to Km.79+513 (LHS), along NH-161 by Open trench Methodology and Highway crossings by HDD methodology at Km. 68+828, Km. 71+576, Km.73+440 & Km.79+513 on Ramsanpalle to Mangloor section of NH-161 in the State of Telangana (9.12 Mb application-pdf)
07-02-2022
3568 Haryana Construction of Six-lane access controlled highway (NH-152D) starting from junction with NH-9 (Rohtak-Jind section) near Kharkara to Junction with NH- 334B (Charkhi Dadri- Jhajjar section) near Charkhi Dadri (Ch. 131+000 to 165+000; length 34 Km) on EPC mode under Bharatmala Pariyojna in the State of Haryana (Pkg-6) - Permission to lay Sultanpur-Jhajjar-Hisar Natural Gas pipeline along with OFC across under construction road b/w Ch. 142.800 to 143.000 at village- Kherari, Tehsil Kalanaur, Dist.- Rohtak (1.35 Mb application-pdf)
07-02-2022
3569 Telangana NHAI - RO Hyderabad - PIU Nirmal-Proposal for laying of Optical Fiber Cable for a total length of 4.947 Km from Km.376+495 to Km.378/405 (RHS),from Km.380+316 to Km.383+300 (RHS), and from Km.383+300 to Km.383+320 (LHS) along NH-44 by Open trench Methodology and Highway crossings by HDD methodology at Km.383+300 on Nagpur to Hyderabad section of NH-44 in the State of Telangana (13.41 Mb application-pdf)
07-02-2022
3570 Maharashtra Four laning of Solapur - Yedshi Section of NH-211 from Km. 0.00 to Km. 100.00 (Design length 98.717 km.) in the State of Maharashtra to be executed as BOT (Toll) on DBFOT pattern under NHDP Phase IVB - Submission of proposal for permission of laying of 11 KV electric fine underground cable work at Ch.89+835 near Chorakhali, Tal. Kalamb, Dist. Osmanabad on Solapur Yedshi Section of NH-211 in the State of Maharashtra (39.37 Mb application-pdf)
04-02-2022

Pages