Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
3471 Haryana NOC proposal for overhead crossing of NH-344 by 132 KV D/C Jagadhari TSS (DFCCIL)–Tapri TSS (IR) Transmission Line between km.84.000 and km.85.000 in District-Yamunanagar in the State of Haryana (832.34 Kb application-pdf)
05-08-2022
3472 Madhya Pradesh Proposal for permission for Water Pipeline crossing on NH-47 at Ch 83.785 (New NH-47 Ch 295.985) Village-Bandedi, Tehsil-Sardarpur, Distt-Dhar under Execution Narmada-Jhabua-Petlawad-Thandala-Sardarpur Micro Irrigation Scheme of Narmada Valley Development Department Authority, Divisioin no. 30, Manawar, District- Dhar in the State of Madhya Pradesh (10.13 Mb application-pdf)
05-08-2022
3473 Madhya Pradesh Proposal for permission for Water Pipeline crossing on NH-47 at Ch 145.276 (New NH-47 Ch 234.059) Village-Rangpura, Tehsil & Distt-Jhabua under Execution Narmada-Jhabua-Petlawad-Thandala-Sardarpur Micro Irrigation Scheme of Narmada Valley Development Department Authority, Divisioin no. 30, Manawar, District- Dhar in the State of Madhya Pradesh (10.33 Mb application-pdf)
05-08-2022
3474 Madhya Pradesh Permission to lay Optical Fiber Cable from Churahat to Sidhi (From Gud Tiraha 400m + Km 286/10 to 303/10 +200 meters upto Sidhi Tiraha) in the Rewa Sidhi Section of NH-39 in the State of Madhya Pradesh (183.01 Kb application-pdf)
05-08-2022
3475 Telangana Proposal for laying of Optical Fiber Cable for a total length of 10.70 Km from Km.112+000 to Km. 115+600 (RHS), from Km.115+600 to Km.117+600 (LHS), from Km 117+600 to Km. 118+000 (RHS), from Km. 118+000 to Km.122+400 (RHS) along NH-44 by HDD method and Highway crossing at Km.112+000, Km.112+300, Km.113+600, Km.115+600, & Km.117+600 by HDD methodology on Hyderabad to Bangalore section of NH-44 in the State of Telangana (3.04 Mb application-pdf)
05-08-2022
3476 Maharashtra Permission for laying of Underground Water Supply Utility line of 350mm dia DI pipe from km 511.950 (Samruddhi Crossing) to km 517.100 (VUP at Addl. MIDC Butibori) on Wardha - Butibori section of NH-361 (Total length -5.33 kms) (along 5.15 km & Across 60m) in the State of Maharashtra (275.64 Kb application-pdf)
05-08-2022
3477 Telangana Proposal for grant of access permission for T-Fiber proposal for atotal length of 30.010 kms,along Khammam to Aswaropeta section of NH-365 BB by open trench methodology,and across the road at Km.13/300, Km. 14/800, Km. 18/000, Km.22/000, Km.22/500,Km.29/220, Km.29/230, Km.34/450, Km.35/450, Km.34/550 & Km.39/80 acrossNH-365 BB of Khammam to Aswaraopet section by HDD methodology in Khammam District in the State of Telangana (4.57 Mb application-pdf)
05-08-2022
3478 Telangana Proposal for laying of Optical Fiber Cable for a total length of 4.98 Km from Km.189+530 to Km.194+450 (LHS), along NH-44 by HDD Methodology and Highway crossings at Km.197+450 by HDD methodology on Hyderabad to Bangalore section of NH-44 in the State of Telangana (2.82 Mb application-pdf)
05-08-2022
3479 Punjab NOC proposal for crossing of Gas Pipeline on NH-05 at km.54.963, km.68.980, km.73.015, km.74.560 in Kharar - Ludhiana section in the Ludhiana District in the state of Punjab by HDD method (873.41 Kb application-pdf)
04-08-2022
3480 Assam Permission for laying 26" Dia (660mm) Crude Oil Pipeline along with Optical Fibre Cable through HAB Method across NH-15 at Km 219+035, Km 247+495 & Km 253+905 for the proposed Paradip-Siliguri-Numaligarh Crude Oil Pipeline Project (356.83 Kb application-pdf)
04-08-2022

Pages