Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
3361 Maharashtra Proposal Request for grant of permission for laying proposed OFC Line of M/s Jio Fibre Pvt Ltd, Mumbai, along and Across on Kalyan - Ahmednagar - Pathardi - Parbhani - Nanded - Bhokar Road NH-61, Ch. Km, 432/00 to 434/00 (Manwat Bypass) for total length of 2.03 Km, in the State of Maharashtra. Applicant: M/s Jio Digital Fibre Pvt Ltd, 101- Saffron, Nr. Centre Point, Panchwati 5 Rasta, Ambawadi Ahmedabad-380006 (680.47 Kb application-pdf)
31-03-2022
3362 Uttar Pradesh Proposal for permission for laying of 125mm MDPE Gas Pipeline across NH-27 at Ch.78.680 (Near JK Colony underpass) for approx. 0.080 km. in the State of Uttar Pradesh (8.08 Mb application-pdf)
31-03-2022
3363 Tamil Nadu NHAI - PIU - Puducherry - Four laning of Sattanathapuram (Km.123/800) to Nagapattinam (Km.179/555) Section of NH-45A on HAM under NHDP Phase-IV in the state of Tamil Nadu - Request for permission to lay Ennore - Thiruvallur- Bengaluru-Puducherry-Nagapattinam-Madurai-Tuticorin R-LNG Pipeline alongwith Optical Fiber Cable (OFC) across NH-45A by Horizontal Directional Drilling Method (HDD) (25.20 Mb application-pdf)
31-03-2022
3364 Madhya Pradesh Four Laning of Jabalpur-Lakhnadon Section of NH-7 from Km 465.500 to Km 546.425 (Package- JL) in the state of Madhya Pradesh under NHDP Phase-IV on EPC mode - Proposal for Permission to Road crossing for Sewerage Pipelineat NH-34, Under Flyover at Ch. 466+260 near Andhmukh Bypass (7.53 Mb application-pdf)
30-03-2022
3365 Rajasthan Proposal for grant of permission for laying/road crossing of Electric Cable along NH27 (Old NH-76) from MS 285.920 to 289.350 and one road crossing at MS 286.100 (Total length=3.43 Km.), Village- Bhatewar on Chittorgarh-Udaipur section in the State of Rajasthan by AVVNL (3.98 Mb application-pdf)
30-03-2022
3366 Maharashtra Four laning of Arnravati - Chikhali section from km 166.000 to km 360.000 section of NH-6 in the State of Maharashtra to be executed on DBFOT Pattern under NHDP Phase-IV-Proposal for laying of OFC cabie along with HDD upon stretch clamping and other suitable method from Balapur Naka to Ridhora from km 250.700 to km 253.600 (RHS) along with proposed line & 2 crossing from (1) km 250.700 (2) km 253.600 along the NH-6 (New NH-53) in the State of Maharashtra by M/s Airtel Telephonic Network Ltd. Total length 2.900 km (607.46 Kb application-pdf)
30-03-2022
3367 Maharashtra Four Lanning of Solapur - Mah /Kar Border Section of NH-9 from Km 249+000 to 348+800 in the state of Maharashtra on Design, Build, Finance, Operate and Transfer (DBFOT) Basis under NHDP Phase - Laying of 11 KV Electric underground cable work on NH-65 at Ch. 314+664 near Dalimb, Tal. Omerga, Dist. Osmanabad (52.48 Mb application-pdf)
30-03-2022
3368 Odisha Rehabilitation and up-gradation to 4- laning from Km.240+250 i.e. Brahmani Bypass end beside BNR Weigh Bridge to Km.287+200 i.e Rajamunda Section of NH-23 (New NH-143) in the state of Odisha under NHDP-IV Pkg-l-B- Proposal for Laying of Clear Water Rising Main and Distribution Network Pipeline Along! Across the NH-143 by RWS&S, Rourkela (6.64 Mb application-pdf)
30-03-2022
3369 Telangana NHAI - RO Hyderabad - PIU Hyderabad- Proposal for laying of Optical Fiber Cabte for a total length of 8.63 Km from Km.52+400 to Km,.53+600 (RHS), from Km.56+500 to Km.60+000 (RHS)}, from Km.60+000 to Km.62+370 (RHS), from Km.59+740 ta Km.59+990 (LHS), & from Km.62+370 to Km.63+590 (LHS) along NH-765 and Highway crossings at Km. 52+400, km.59+700, & Km.62+370 by HDD methodology on Hyderabad to Srisailam section of NH-765 in the State of Telangana (7.10 Mb application-pdf)
29-03-2022
3370 West Bengal Submission of Proposal towards ROW permission for laying OFC through underground (HDD) method from (i) km 613.700 to km 634.00 (Oodlabari to Chalsa) of length 20.300 km of NH-31 (Il) KM 105.000 to km 107.910 (chalsa square to essar petrol Pump) of length 2.190 km on NH-31C (iii) km 115.545 to km 123.700 (Jaldhaka bridge to Kuchi Diana Bridge) of length 8.125 km on NH-31C (iv) km 124.080 to km 125.500 (Kuchi Diana bridge to Changmari TG) of length 1.420 km on NH-31C & (v) km 127.430 to km 145.632 (Diana bridge to Telipara more) of length 18.202 km on NH-31C in total length of 50.237 km in West Bengal (778.60 Kb application-pdf)
29-03-2022

Pages