Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
2741 Tamil Nadu Erection of 33KV Over Head Transmission Line by crossing the NH road at Km.135/550 of Trichy Bypass (connecting Thuvakudi–Mathur–Panjappur) on NH-83 (Old NH-No.67) (6.71 Mb application-pdf)
30-06-2023
2742 Andhra Pradesh Providing water supply to Prioritized Industrial Clusters in the State of Andhra Pradesh–Southern region (APIIC-VICDP-05)–Laying of DI Water Pipeline across Tada-Nellore Section of NH-16 (2.22 Mb application-pdf)
30-06-2023
2743 West Bengal Permission for laying of IOCL's CGD pipeline network in NHAI corridor along the NH-6 (New NH-16) from Km 76.00 to Km 112.245 and also 2 nos crossing on NH-6 (New NH-16) under City Gas Distribution Project Haldia in the State of West Bengal (325.01 Kb application-pdf)
30-06-2023
2744 Andhra Pradesh Permission for laying of water pipeline along Kurnool-Kadapa section of NH-40 from Orvakal at Km 336+830 to Pudicherla at Km 341+430 (RHS) for a length of 4660m in the State of Andhra Pradesh (1.79 Mb application-pdf)
30-06-2023
2745 Andhra Pradesh Permission for laying of DI water pipelines by crossing NH-565 at 6 locations in between Km 452+930 to 497+240 on Penchalakona–Yerpedu Section of NH-565 for a total length of 235m by M/s. APIIC in the State of Andhra Pradesh (1.57 Mb application-pdf)
30-06-2023
2746 Andhra Pradesh Permission for laying of gas pipeline of 12”(305 mm) Carbon Steel pipe & 40 mm OFC duct along the road from Km 134/890 to Km 135/550(LHS) & from Km 135/550 to Km 136/300(RHS) & from Km 136/300 to Km 136/360(LHS) & from Km 136/360 to Km 137/000(RHS), from Km 137/000 to Km 141/000(LHS) from Km 141/000 to Km 155/860(RHS) from Km 155/860 to Km 158/170(LHS) for a total length of 23.280 Kms and crossings at Km 135/550, Km 136/300, Km 136/360, Km 137/000, Km 141/000 & Km 155/860 along AP/TN Border-Nalagampalli Section of NH-4 by M/s. AG&P Gas Pvt. Ltd. for a total length of 23.280 Kms in the State of Andhra Pradesh (1.58 Mb application-pdf)
30-06-2023
2747 Andhra Pradesh Permission for laying of gas pipeline of 12” dia. Steel pipeline, 125 mm dia MDPE Gas pipeline & 40mm HDPE Duct for OFC Cable along Renigunta–Naidupeta section of NH-71 from Km 124/600 to Km 128/200 LHS (from KLM Circle near NH-205 to Renigunta Circle) for a total length of 3400m and crossings at Km 124/600 & Km 128/000 by M/s. AG&P Gas Pvt. Ltd., in the State of Andhra Pradesh (1.21 Mb application-pdf)
30-06-2023
2748 Tamil Nadu NHAI, PIU, TRICHY–Trichy–Madurai section of NH-38 (Old NH-45B)–TWAD Board–CWSS to 174 habitations in Manikandam and Anthanallur unions of Trichy District under Jal Jeevan Mission for laying of water pipe line along the road from km.14/950 to km.15/000 (50m), km.11/200 to km.11/690 (490m), km.11/690 to km.11/940 (250m), km.11/980 to km.12/800 (820m) km.12/800 to km.12/830 (30m HDD method) on LHS & km.14/950 to km.15/000 (50m), km.11/200 to km.11/690 (490m), km.11/940 to km.11/980 (40m) on RHS and across at km.15/000,11/690, km.11/940, km.11/980 for a total length of 2400m by open trench & HDD method (4.03 Mb application-pdf)
30-06-2023
2749 Tamil Nadu NHAI, PIU-Chengalpattu–Highway Administration Tambaram to Tindivanam section of NH-45 from Km.28/000 to Km.121/000 in the State of Tamil Nadu-Construction of New Storm Water Drain by CMDA in Kilambakkam Village (16.09 Mb application-pdf)
28-06-2023
2750 Tamil Nadu Proposal for laying proposed 16" dia multi product pipeline with OFC Duct along the road on NH-44 from Km 142.074 to Km 156.000 (RHS) & Km 164.900 to Km 180.000 (RHS) for a total length of 29.026 Km (Krishnagiri to Thumbipadi section) by Open Trench Method in the limit of NHAIL Salem by M/s Bharat Petroleum Corporation Limited, Chennai (346.02 Kb application-pdf)
27-06-2023

Pages