Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
271 Gujarat Proposal for obtaining Permission for underground Laying of 11 KV XLPE Electric Cable (300 Sq. mm) & 125 MM Dia HDPE Pipe of M/s UGVCL along & across at Different Location Between Km 590+000 to Km 596+000 of NH-27 at Palanpur, Taluka-Palanpur, District-Banaskantha, in the State of Gujarat (136.15 Kb application-pdf)
12-03-2025
272 Haryana Proposal for grant of Permission to M/s GAIL (India) Limited for laying of 12" dia Steel Gas Pipeline alongwith OFC cable along the NH-503-A on Amritsar–Mehta–Shri Hargobindpur-Tanda Road, from KM 59.400 to KM 59.900 (LHS), from KM 59.900 to KM 62.300 (LHS) & crossing of NH at KM 59.400 & 59.900 in District–Gurdaspur in the State of Punjab by HDD Method (365.73 Kb application-pdf)
12-03-2025
273 Uttar Pradesh Request for grant of permission to lay 12-inch steel pipeline on NH-34 from milestone Km.91.250 (Near Goswami Restaurent & Dhaba) to milestone Km. 120.250 (Near Hanuman Temple, Barbai) Hamirpur and Mahoba region through HDD/Open cut method. Total length 28.880 Km (excluding Chandrawal Bridge length) in District-Hamirpur and Mahoba in Uttar Pradesh (1,007.42 Kb application-pdf)
12-03-2025
274 Maharashtra Permission for 01 no. crossing of Water Supply Pipeline at km 199.200 section of Taloda-Burhanpur on NH-753BE under scheme AMRUT 2.0 in Maharashtra (1.25 Mb application-pdf)
12-03-2025
275 Gujarat Proposal seeking ROW Permission for Laying and crossing of 66KV D/C line partially on O/H with ACSR Panther conductor having approximate line length 8.7 KMs & partially with (6+1) 630 sq. mm underground cable having route length 11.7 KM from 66 KV switch yard of our 220 /66 KV Wagra S/S to M/s NHRCL DSS - Dahegam under deposit scheme for crossing on VME P-4 at km 287.410 between km 287.00 to km 287.500 (Interchange) near village Dahegam Taluka & District-Bharuch in the State of Gujarat (140.77 Kb application-pdf)
12-03-2025
276 Rajasthan Proposal for grant of ermission for 25nos. of crossings & 3.650 km length of pipe P g9 P 9 P proposed to be laid along the Tonk-Sawaimahdopur section of NH-552 (1.87 Mb application-pdf)
12-03-2025
277 Uttar Pradesh Proposal for the permission of laying U/G water Pipeline (HDPE Pipe) by HDD Method along/across NH-731K Majhola to Pilibhit & Bisalupr to Shahjahanpur Road from Ch. 86.450 to Ch 87.495 LHS (length-1043M), from Ch. 86.452 to Ch. 87.622 RHS (length-1170M) from Ch. 87.602 to Ch. 88.981 LHS (length-1379M), Sub District-Piliphit & Bishalpur, in the State of Uttar Pradesh (687.70 Kb application-pdf)
12-03-2025
278 Uttar Pradesh Proposal for the permission of laying U/G Water Pipeline (HDPE Pipe) By HDD Method along/across NH-731, Lucknow-Sultanpur Road, from Ch.- 132.129 to Ch.-133.101 (LHS, Length-972.0m), From Ch.-132.528 to Ch.-133.251 (RHS, Length-723.0m) at G.P. -Harkhi, Doulatpur, Bankepur & Mahajitpur, District-Sultanpur, in the State of Uttar Pradesh (2.67 Mb application-pdf)
12-03-2025
279 Uttar Pradesh Providing NOC for laying of underground 16" (400mm Dia) Carbon steel Gas Pipeline with OFC 40mm Dia by trenchless method at Km. 146.500 (Sadar Hospital) to Km. 175.000 (Salempur) total (28.500 Km) of NH-727A in the State of Uttar Pradesh (1.03 Mb application-pdf)
11-03-2025
280 Madhya Pradesh Introducing AI based system to curb illegal transportation of minerals for G&M project document approval (8.03 Mb application-pdf)
11-03-2025

Pages