Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
2101 Gujarat Proposal seeking ROW permission for Drinking Water Supply pipeline crossing & Parallel of 914mm Dia MS Carrier Pipe with 1200mm Dia MS Casing Pipe by pushing - Open Excavation Method at Sachin Palsana ROB, near Sachin-Navsari Road, Opp. 10CL Pump Sachin Junction of NH-53 at Km 36+000 to Km 36+050 in the State of Gujarat (3.51 Mb application-pdf)
26-02-2024
2102 Maharashtra Proposal for permission for laying of 33 KV 300 sqmm UG cable along the National Highway from km 23.100 to km 24.900 (total length 1.8km) on NH-44 (Nagpur-Chandrapur Highway) from Butibori to Satgaon Fata Butibori under Tender T-02 (OH-UG) Scheme under Butibori divisional (571.38 Kb application-pdf)
26-02-2024
2103 Maharashtra Proposal for crossing on NH-52 (Old NH-211) Highway under Maharashtra Jeevan Pradhikaran, Jalgaon (567.78 Kb application-pdf)
26-02-2024
2104 Odisha NOC proposal for ROW permission for laying of 300mm dia Iron Ore Slurry pipeline and 200mm dia return water pipeline with 02 nos. of 50 mm OFC ducts crossing the ROW Corridor of NH-215 (New NH-20) at Km. 125+305 (1.60 Mb application-pdf)
26-02-2024
2105 Odisha Rehabilitation and up-gradation of existing 2-lane to four laning of Koida-(Km.206+200) to Rajamunda (Km.259+453) section of NH-215 (New NH-520) in the State of Odisha under NHDP-Ill on EPC Mode- Laying of 0.800 M dia of Iron Ore Slurry Pipeline with 65 mm OFC along NH-215 (New NH-520) on LHS from Koida (Km.215+000) to Rajamunda (Km.259+453) (17.62 Mb application-pdf)
26-02-2024
2106 Odisha NOC proposal for ROW permission for laying of dia Iron Ore Slurry pipeline with return water pipeline and OFC from km. 356+070 to km. 368+000 i.e, from Samal Auto Judia Keonjhar to Kaksada village on NH-49 (1.67 Mb application-pdf)
26-02-2024
2107 Odisha Laying of 0.800 M dia of Iron Ore Slurry Pipeline with 65 mm OFC along NH-23 (New NH-143) from Rajamunda (Km.287+200) to Narendra (Km. 292+450) on LHS and crossing at Km.292+450 (15.49 Mb application-pdf)
26-02-2024
2108 Assam Application for Permission to carry out the Horizontal Directional Drilling(HDD) at NH-37(Old) ,NH-127(NEW) of Chainage 314 KM to 315 KM for laying of 11 KV Line underground electric cable at Hatigaon,Kaliabor (312.93 Kb application-pdf)
24-02-2024
2109 Assam Four laning from Rangagara to Kaliabor Tiniali (km 297+000 to 315+315) in Nagaon District in the State of Assam under SARDP-NE, Phase A, on EPC basis : Application for permission to carry out the Horizontal Direction Drilling (HDD) at NH-37(old), NH-127(New) of Chainage 314 km to 315 km for laying of 33 KV Line underground electric cable at Hatigaon, Kaliabor (1.04 Mb application-pdf)
24-02-2024
2110 Assam Four laning from Rangagara to Kaliabor Tiniali (km 297+000 to 315+315) in Nagaon District in the State of Assam under SARDP-NE, Phase A, on EPC basis : Application for permission to carry out the Horizontal Direction Drilling (HDD) at NH-37(old),NH-127(New) of Chainage 314 km to 315 km for laying of 11 KV Line underground (Bamuni feeder) electric cable at Hatigaon, Kaliabor (1.03 Mb application-pdf)
24-02-2024

Pages