Sorry, you need to enable JavaScript to visit this website.
E.g., 22-07-2025
E.g., 22-07-2025
Circulars / Notifications related to Debarment / Blacklisting
S.No. Subject दिनांक
11 Rehabilitation and Up-gradation to 2 lane with paved shoulder from existing chainage km 166+100 to km 192+980 (design chainage km 146.700 to km 162.800) including construction of Bhimber Gali tunnel (total length of tunnel 1.100 km) under 31 TF on Akhnoor-Poonch road (NH-144A) in the UT of Jammu & Kashmir under Project Sampark Border Roads Organization (BRO) on EPC mode. (package-VII)-Intimation regarding adverse action/debarment/blacklisted/non-performance of the firms (506.39 Kb application-pdf)
20-11-2023
12 Debarment of Mr. Harendra Kumar Singh from the engagement of MoRTH/ NHIDCL/ NHAI project for a period of 03 years (1.09 Mb application-pdf)
22-09-2023
13 Debarment of Mr. Javed Khan for a period of two years for all projects of MoRTH (2.39 Mb application-pdf)
07-06-2023
14 Consultancy Services for Authority Engineer for Supervision of (i) Upgradation to two lane with paved shoulder of Hanumangarh to Kenchiyan from km 0/000 (existing Chainage km 23.200) to km 49/605 (existing Chainage km 23.200) of NH-54 in the State of Rajasthan on EPC Mode (ii) Construction of flyover at Indira Circle along with LVUP a with provosion of RE walls in approaches in the State of Rajasthan on EPC Mode lntimation regarding adverse action/ debarment/ blacklisted/ non-performance of the firms/ key Personnel (2.45 Mb application-pdf)
02-03-2023
15 Upgradation/Strengthening to 2 lanes with paved shoulder along with service road in part length) from km 92/400 to km 127/350 on Alwar-Nuh section of NH-248A on EPC Mopde in the State of Rajasthan (Job No. NH-248A/RJ/2018-19/726) (229.00 Kb application-pdf)
13-02-2023
16 Debarment of Shri Mani S from the training programs of IAHE for a period of 2 years (539.83 Kb application-pdf)
13-02-2023

Pages