Sorry, you need to enable JavaScript to visit this website.
Internship of B.Tech/ M.Tech Civil Engineering students in National Highway Projects
S.No. Subject दिनांक
1 Upgradation/Strengthening to 2 lanes with paved shoulder along with service road in part length) from km 92/400 to km 127/350 on Alwar-Nuh section of NH-248A on EPC Mopde in the State of Rajasthan (Job No. NH-248A/RJ/2018-19/726) (229.00 Kb application-pdf) 13-02-2023
2 Debarment of Shri Mani S from the training programs of IAHE for a period of 2 years (539.83 Kb application-pdf) 13-02-2023
3 Debarment of Shri Sanjeev Kumar Sinha from the engagement of MoRTH/ NHIDCL/ NHAI project for period of 2 year (550.74 Kb application-pdf) 24-01-2023
4 Consultancy Services for Authority Engineer for Supervision of following 3 Projects (i) Up-gradation & Rehabilitation to Two lane with paved shoulder of Barmer-Ghaghariya section from km 0.972 to 69.910 of NH-25Ext (ii) Construction of 4 lane ROB and its approaches in lieu of existing level crossing no.328A at km 0.500 of NH-25E (iii) Construction of 4 lane Road Over Bridge from Design Chainage at km 0.000 to Design Chainage at km 1.060 in a length of 1.060 kms on EPC Mode in the State of Rajasthan, Intimation regarding adverse action/ debarment/ blacklisted/ non-performance of the firms/ key Personnel (2.25 Mb application-pdf) 21-10-2022
5 Consultancy services for Authority’s Engineer for Supervision of Construction of New 4-Lane Bridge across River Kosi at Phulaut including Rehabilitation and Upgradation of existing Birpur-Bihpur section of NH-106 from Km.106.000 to Km. 136.000 to 2-Lane with Paved Shoulder in the State of Bihar on EPC mode -Debarment of key personnel (293.94 Kb application-pdf) 20-10-2022
6 Debar of Shri Jayant Bhatnagar, former Director, C-DoT, from future assignment (456.65 Kb application-pdf) 17-10-2022
7 Debarment of M/s Ceigall India Limited - Patel Engineering Limited (JV) from engagement on NHAI or Centrally sponsored Road Works projects for a period of Six Months (i.e. for the period 30.05.2022 to 29.11.2022) (755.49 Kb application-pdf) 11-10-2022
8 Construction of 8 lane Dwarka Expressway from Delhi-Haryana Border to start of Rail over Bridge, Gurugram (Chainage from km 9+500 to km 19+700) in the state of Haryana (NH-248BB) Package-III on EPC mode-Action against Personnel of Contractor (172.88 Kb application-pdf) 06-10-2022
9 Consultancy services for Authority's Engineer for supervision of following two Projects. (i) Widening of Pachpadra-Bagundi section to 4 lane of NH-25 on EPC Mode and (ii) 4 lane divided carriageway from km 0.000 (km 144.200 of NH-15 (New NH-68) to km 21.042 (km 160.700 of NH-15 (New NH-68) barmer Bypass of NH-15 (New NH-68) on EPC Mode in the state of Rajasthan-Intimation regarding adverse action/ debarment/ blacklisted/ non-performance of the firms/ Key Personnel (1.69 Mb application-pdf) 15-09-2022
10 Up-gradation to 2 lane with Paved shoulder from Charbhuja at Design km 0.00 (existing km 150.00) to Neechli oden (Nathdwara) at Design ch. Km 88.800 (existing km 55.950) of NH-162E on EPC mode.Intimation regarding adverse action/ debarment/ blacklisted/ nonperformanceof the firms/ key Personnel (2.82 Mb application-pdf) 26-08-2022

Pages