E.g., 19-03-2024
E.g., 19-03-2024
Circulars / Notifications related to Debarment / Blacklisting
S.No. Subject Date
1 Consultancy services for Authority Engineer for supervision of the work of Up-gradation to 2 lane with paved shoulder from Neechli Oden (Nathdwara) at design km 88.800 (existing km 55.95) to Bhatewar at Design km 142.028 (existing km 0.00) of NH-162E in the State of Rajasthan on EPC Mode-Intimation regarding adverse action/ debarment/ blacklisted/ non-performance of the firms/ key Personnel (2.56 Mb application-pdf)
01-02-2024
2 Debarment of M/s JC Technocrats Pvt. Ltd. from all Consultancy Works of NH PWD for one year from all works of NH PWD/ MoRTH/ Centrally sponsored works of Ministry with immediate effect (6.34 Mb application-pdf)
24-01-2024
3 Widening and Strengthening of 2 lane with Paved Shoulder from existing Ch. 56+720 to 100+820 and Design Ch. from 62+600 to 106+360 (Total Length=43.760 Km) on Srinagar Baramula-Uri (NH-01) in the UT of J&K Under Project Beacon, Border Roads Organization (BRO) On EPC Mode (SBU-Pkg-IV)-Intimation regarding adverse action/debarment/blacklisted/non-performance of the firms (314.78 Kb application-pdf)
20-11-2023
4 Rehabilitation and Up-gradation to 2 lane with paved shoulder from existing chainage km 166+100 to km 192+980 (design chainage km 146.700 to km 162.800) including construction of Bhimber Gali tunnel (total length of tunnel 1.100 km) under 31 TF on Akhnoor-Poonch road (NH-144A) in the UT of Jammu & Kashmir under Project Sampark Border Roads Organization (BRO) on EPC mode. (package-VII)-Intimation regarding adverse action/debarment/blacklisted/non-performance of the firms (506.39 Kb application-pdf)
20-11-2023
5 Debarment of Mr. Harendra Kumar Singh from the engagement of MoRTH/ NHIDCL/ NHAI project for a period of 03 years (1.09 Mb application-pdf)
22-09-2023
6 Debarment of Mr. Javed Khan for a period of two years for all projects of MoRTH (2.39 Mb application-pdf)
07-06-2023
7 Consultancy Services for Authority Engineer for Supervision of (i) Upgradation to two lane with paved shoulder of Hanumangarh to Kenchiyan from km 0/000 (existing Chainage km 23.200) to km 49/605 (existing Chainage km 23.200) of NH-54 in the State of Rajasthan on EPC Mode (ii) Construction of flyover at Indira Circle along with LVUP a with provosion of RE walls in approaches in the State of Rajasthan on EPC Mode lntimation regarding adverse action/ debarment/ blacklisted/ non-performance of the firms/ key Personnel (2.45 Mb application-pdf)
02-03-2023
8 Upgradation/Strengthening to 2 lanes with paved shoulder along with service road in part length) from km 92/400 to km 127/350 on Alwar-Nuh section of NH-248A on EPC Mopde in the State of Rajasthan (Job No. NH-248A/RJ/2018-19/726) (229.00 Kb application-pdf)
13-02-2023
9 Debarment of Shri Mani S from the training programs of IAHE for a period of 2 years (539.83 Kb application-pdf)
13-02-2023
10 Debarment of Shri Sanjeev Kumar Sinha from the engagement of MoRTH/ NHIDCL/ NHAI project for period of 2 year (550.74 Kb application-pdf)
24-01-2023

Pages