Sorry, you need to enable JavaScript to visit this website.

You are here

  • Permission for laying of 18"Dia (24"Casing Pipe) Petroleum Product pipeline with OFC cable by Bharat Petroleum Corporation Ltd. Buna Dist. Sagar under Scheme Bina-Panki (Kanpur) petroleum Product at km. 53.855, Village Pachauro, Tehsil Mauranipur
  • Proposal for access permission for approach roads at km 408/125 to 408/160 (LHS) on NH-26 to the proposed retail outlet of Shri Anup Kumar Choudhury (Applicant of BPCL) at Mouza-Pottangi, Tahasil-Pottangi, Dist-Koraput in the state of Odisha
  • Proposal for access permission for approach roads at km 95/307 to 95/342 (RHS) on NH-57 to the proposed retail outlet of Shri Sanjaya Kumar Panda (Applicant of HPCL) at Mouza-Tutursinga, Tahasil-Boudh, Dist-Boudh in the state of Odisha
  • Proposal for access permission for approach roads at km 252/177 to 252/27 (RHS) on NH-57 to the proposed retail outlet of Shri Bhagyarathi Behera (Applicant of IOCL) at Mouza-Mandalsingh, Tahasil-Bolagarh, Dist-Khordha in the state of Odisha
  • Proposal for access permission for approach roads at km 80/900 to 80/932 (RHS) on NH-149 to the proposed retail outlet of Shri Dillip Kumar Behera (Applicant of BPCL) at Mouza-Gotamara, Tahasil-Banarpal, Dist-Angul in the state of Odisha
  • Proposal for access permission for approach roads at km 163/811 to 163/846 (LHS) on NH-57 to the proposed retail outlet of Shri Jyoti Ranjan Sahoo (Applicant of BPCL) at Mouza-Banigochhakhesara, Tahasil-Daspalla, Dist-Nayagarh in the state of Odisha
  • Granting ROW permissions for laying of OFC (Telecom Cables/Ducts) from Wangthoibi Temple/Likram Leirak Junction, Tera on NH-53 (New-37) to Jiribam Bridge in the State of Manipur
  • Proposal for grant of access permission to the proposed retail outlet by M/s.BPCL at km.206/006-051 (RHS, Survey no.13) of Nagpur-Hyderabad Section of NH-44 in Sy.No.13 of Kamalapur Village, Gudihathnoor Mandal, Adilabad District in the State of Telangana
  • nvitation for Public Comments_2266_Proposal for laying of underground water pipeline along NH-2 land for WBIDCL from Km 514.735 to Km 515.236 (LHS), Panagarh, Dist - Burdwan
  • Invitation for Public Comments_2265_laying of OFC from Gobindapur Bazar More to Panchpota Jama Masjid Jio Chamber Chainage from Km 97.253 to Km 98.574 of NH-34 _Vodafone
  • Proposal for laying of underground water pipeline across NH-2 land for WBIDCL at Km 514.735, Panagarh, Dist - Burdwan
  • Balance work for Four laning of Bhopal-Biaora section of NH-12 from Mubarakpur to Biaora from km. 324.000 to km 423.400 (Package-II) on EPC mode in the state of Madhya Pradesh-Proposal of 132 KV Narsinghgarh-Suthaliya DCEE line crossing over head to NH
  • Proposal for permission to lay 750 mm to 200mm D1 and 160mm PVC pipe between Km.284/872 (Vikram Sarabhai road) and 286/610 (Kundannoor Junction) on NH 85 (Madura-Kochi road) By Kerala Water Authority in Ernakulam district Under NH Division, Muvattupuzha in the State of Kerala
  • Uploading case for relaxation on NH 47
  • Proposal for road crossing by KLIS water pipeline at km 42/6-8 of Nizamabad-Jagdalpur road of NH-63 in the State of Telangana
  • Proposal for permission for laying Raw water pumping pipe line (KIIFB-Phase -II-Augmentation to WSS to Kollam Corporation Phase-II-Package-I) using 1219mm M.S pipe by Kerala Water Authority on NH 183 (Kollam-Theni) from Km.13/770 (Elampalloor Jn) to Km.16/250 (Neerozhickal Jn) under NH Division Kollam, in the State of Kerala
  • permission for construction of Foot over bridge to connect commerce Block with science block of Vikram Dev (Auto) college, jeypore in koraput district over NH-26 at RD. 340/700km
  • Two lane with paved shoulders configuration of Tindivanam to Krishnagiri Section (Km 37/600 to Km 214/110) of NH-66 – Crossing of 765 KV DC North, Chennai Pooling SS – Ariyalur 765 KV SS Transmission Line at Km 80/380 of NH-66 in the State of Tamil Nadu
  • Permission Proposal for laying drinking water pipe line along the road from Km 175/080 to Km 177/800 for a length of 2720 meters (LHS) of Trichy – Karur Section of NH-67 in the State of Tamil Nadu
  • Proposal for access permission for approach roads at km 546/295 to 546/335 (LHS) on NH-53 to the proposed retail outlet of Shri Rajkishor Mishra (Applicant of IOCL) at Mouza-Padhanpali, Tahasil-Jujumura, Dist-Sambsalpur in the state of Odisha
  • Proposal for access permission for approach roads at km 192/100 to 192/135 (RHS) on NH-55 to the proposed retail outlet of Shri Akash Agrawal (Applicant of IOCL) at Mouza-Nayapalli, Tahasil-Rairakhol, Dist-Sambalpur in the state of Odisha
  • Proposal for access permission for approach roads at km 269/645 to 269/690 (LHS) on NH-16 to the proposed retail outlet of Reliance Industries Limited at Mouza-Nakhara, Tahasil-Bhubaneswar, Dist-Khurda in the state of Odisha
  • Proposal for access permission for approach roads at km 62/200 to 62/235 (RHS) on NH-53 to the proposed retail outlet of Shri Shreyan Samantaray (Applicant of IOCL) at Mouza-Naladiasasan, Tahasil-Mahakalpada, Dist-Kendrapara in the state of Odisha
  • Proposal for access permission for approach roads at km 144/515 to 144/550 (RHS) on NH-326 to the proposed retail outlet of Shri B Bhaskar Roa (Applicant of HPCL) at Mouza-Kalimela, Tahasil-Kalimela, Dist-Malkangiri in the state of Odisha
  • Request for permission to lay Underground Optical Fibre cable on NH-7 (Krishnagiri to Thumbipadi Section) between km 134/000 to Km 136/000 (RHS) for a total length of 2000m in the State of Tamil Nadu
  • Invitation of public comments for permission for laying water supply pipeline from Km49/970 to Km 49/990 (BHS) in Thanjavur
  • permission to lay Underground Optical Fibre cable on NH-7 (Krishnagiri – Thumbipadi section) between Km 114/850 to Km 114/950 (RHS), Km 122/200 to 122/400 (RHS), and two crossing Km 114/850 and Km 122/220 in the State of Tamil Nadu
  • permission to lay Underground Optical Fibre cable on NH-7 (Salem to Ulundurpet Section) between Km 4/030 to Km 4/400 (RHS), Km 4/300 to 4/400 (LHS), Km 76/210 to Km 76/670 (LHS) and Km 76/210 to Km 76/615 (RHS) (for a total length of 1335m) and two crossings @ Km 4/400 & Km 76/210 in the State of Tamil Nadu
  • Permission for laying underground Optical Fiber Cable from Uchbhatti to Saragbundiya, Ch.5.00 to Ch.22.80, section of NH-149B, in District Korba, Chhattisgarh
  • Permission for laying underground Optical Fiber Cable from Ch.1.40 to Ch.13.60, Ch. 83.90 to Ch.87.00 section of NH-153, in the State of Chhattisgarh
  • Relaxation of norms for the proposal for the construction of an approach road & slab culvert for proposed retail outlet of HPCL at Km. (303.258-303.293) abutting on (LHS) road section of Old NH-12A (New NH No.30) at Kh No:159(P), Ph.No-34, Village-Basni, Tehsil & Distt-Bemetara Chhattisgarh
  • Permission to laying underground Optical Fiber Cable from Ch. 8.00 to Ch. 23.3, Ch. 27 to Ch. 47.3 & Ch. 47.3 to Ch. 49.5, section of NH-49 in the State of Chhattisgarh
  • Permission for laying underground Optical Fiber Cable from Pondi to Pandatarai Turning, Ch. 0.00 to Ch.11.00, section of NH-130A, in District Kabirdham Chhattisgarh
  • Proposal for provisional NOC for access permission to the proposed retail outlet of M/s Indian Oil Corporation Limited in Km.50(Ch.49.025,RHS)NH-96 (New NH-330) at Ranjit chilbila, Teshil & District - Pratapgarh in the state
  • Permission Proposal for Erection of 110KV DC Over Head line crossing at Km 150/245the vertical clearance is 14.25m of NH-544 in the State of Tamil Nadu
  • Permission for laying of 30" Dia Pipe Line alongwith OFC duct across NH 114A at Ch. 128.565, Ch. 160.792 & Ch. 164.641 for proposed Haldia Barauni Underground Pipe Line Project
  • Permission for laying underground optical fiber cable along LHS of Kota-Chittorgarh (Kota Bypass) route, NH-76 from Ch. 1053.00 to 1056.00 Km 03.00 Km & 02 nos. road crossing at i) Ch. 1053.940/1054.00 (Length–0.060Km) ii) 1056.00 Km (length-0.060Km) total section of ROW applied is 3.00 Km & 02 nos. (length-0.120) in state of Rajasthan
  • Permission for laying underground Optical Fiber Cable from Kuswabahari Turning to Chhatamura Turning, Ch.161.60 to Ch.183.80, section of NH-49, in District Bilaspur Chhattisgarh
  • Proposal for final formal permission and signing of license deed for access to the proposed fuel station of M/s IOCL on NH -330 (Old NH No. 96) at Km. 126.339 (RHS), Village - Patupur, Tehsil - Bikapur & District Faizabad in the State of Uttar Pradesh
  • Access Permission for the laying of Optical Fibre Cable (OFC) line of M/s Gujarat Fibre Grid Network Limited along and across NH-51 on Bhavnagar
  • PUBLIC COMMENTS FOR NH 41
  • Proposal for grant of access permission to the proposed new retail outlet by M/s IOCL at Km 119/805-840 RHS of Pasarlapudi-Dindi section of NH-216 of Andhra Pradesh
  • Proposal for laying/crossing of OFC from chainage 397.645 to chainage 427.400 (From Dakbunglow Chowk to Sunguda Sub- Post Office) of NH·53
  • Proposal for grant of access permission to a new retail outlet of M/s IOCPL at Km. 399.520 to Km. 399.550 of NH-11 at village - Fatehpurr in the Rajasthan
  • Permission of Right of way for laying of underground Petroleum product pipe line crossing across NH-16 at chainage km.184+292 near Hiratikiri village and NH-18 at chainage km.79+893 near Sahupada under Remuna Tahasil,
  • Proposal for NOC for access permission to the proposed fuel station on NH-146 in (Ch. 48.520, RHS) at Khasra No. 135/2, Village-Dhakna Chapna, Tehsil-Raisen & Distt.-Raisen in the State of Madhya Pradesh
  • Proposal for access permission for approach roads at km 143/971 to 144/006 (LHS) on NH-326 to the proposed retail outlet of Smt. Bojja Kushubu (Applicant of IOCL) at Mouza-Kalimela, Tahasil-Kalimela, Dist-Malkangiri in the state of Odisha
  • Proposal for access permission for approach roads at km 16/677 to 16/712 (LHS) on NH-316 to the proposed Retail Outlet of Shri naresh Chandra Sahoo (Applicant of IOCL) at Mouza-Ekchalia, tahasil-Pipili, Dist-Puri in the state of Odisha
  • Proposal for access permission for approach roads at km 98/713 to 98/748 (LHS) on NH-26 to the proposed retail outlet of Shri Bishnu Prasad Kedia (Applicant of IOCL) at Mouza-Sarasbahal, Tahasil-Deogaon, Dist-Bolangir in the state of Odisha
  • Krishnagiri section of NH-44 (Old NH-7) - Laying of water pipeline along the road from Km.35/950 to Km.36/120 (LHS), Km.35/950 to Km.36/120 (RHS), Km.39/600 to Km.39/620 (LHS) & Km.42/000 to Km.42/076 (LHS) and Road Crossing at Km.36/120, Km.39/620 & Km.42/076 of NH-44
  • Permission to Lay OFC along the road and across NH-47 by M/s. BSNL on Chengapalli to Walayar Section of NH-47
  • Karaipettai section of NH-4 - Request for permission to lay 33KV 1 x 630 Sq.mm XLPE UG Cable from Nokia 230KV SS to proposed Sriperumbudur 33/11KV SS at Km.41/360 to Km.42/200 (RHS) along the road by Open Trench Method and across the road in one location at Km.42/200 by Trenchless Method in Sriperumbudur – Karaipettai section of NH-4 in the State of Tamil Nadu
  • Tindivanam section of NH-45 - Request for permission to lay 33KV 1 x 630 Sq.mm XLPG UG Cable from Sriram Properties 110 KV SS to Mudichur 33/11 KV SS across the road in one location at Km.30/100 by HDD Method in Tambaram – Tindivanam section of NH-45 in the State of Tamil Nadu
  • Permission Proposal for Erection of 110KV DC Over Head line crossing at Km 150/245the vertical clearance is 14.25m of NH-544 in the State of Tamil Nadu
  • Permission for laying OFC along Trichy - Karur Section from Km 174/700 to Km 203/400 (RHS) and across road at Km 174/700 in the State of Tamil Nadu
  • Two lane with/without paved shoulders from Tindivanam to Krishnagiri Section (KM 37/600 to km 214/110) of NH-66 in the State of Tamil Nadu – Erection of 33 KV and 11KV Line with EB Poles along the road from Km 144/100 to Km 147/300 (LHS), Km 147/300 to Km 150/150 (RHS), from Km 150/150 to Km 155/258 (LHS), from Km 152/030 to Km 155/258 (RHS), Km 155/258 to Km 160/650 (LHS) and 4 nos. of crossings at Km 144/100, Km 147/300, Km 150/150 & Km 155/258
  • Proposal for NOC permission for laying of underground steel pipeline along NH-24A from Ch.0.000 to Ch.0.800 in the State of Uttar Pradesh
  • Proposal for NOC permission for laying of underground steel pipeline along NH-24A from Km.0.800 to Km.1.850 in the State of Uttar Pradesh
  • Proposal for NOC for overhead crossing of 132 KV D/C LILO of 132 KV Phulpur – Saraon overhead Transmission Line on NH-96(330) at Km.132.833 near Village – Kaurihar, Faizabad – Prayagraj Section the State of Uttar Pradesh
  • Proposal for NOC for overhead crossing of NH-233 (New NH-28) by 220 KV DC Bhaukhari (Basti 400 KV) Dulhaipar Transmission Line at Km.85.246 near Village - Karha, Tehsil - Rudhauli & District - Basti in the State of Uttar Pradesh
  • Relaxation of norms for the proposal for the permission for construction & use of approaches/access road for proposed Retail Outlet at Old NH-86 Ext. (New NH-146), Hand Written Ch. 11.037, RHS, Part of Survey No. 10/2/3, Ph. No. 12, Village-Bilarkho
  • Permission to use right of way for laying and crossing of DI pipeline under l\MRUT Scheme along and across the NH-16
  • Permission for laying of 33 kv underground cable of 33/11 kv sub-station, Ambabai, Distt.-jhansi at NH-75, Gwalior-Jhansi road
  • Permission for laying Oil pipe line of M/s lndian Oil Corporation Ltd Manmad Across Km, 206/300 NH-61 (222) Kalyan - Akemadnagar - Nanded- Nirmat Section of NH- 61 (222) in the state of Maharashtra
  • M/s BPCL on NH-703 at Km 4.409(RHS) in the State of Punjab
  • Permission for laying OFC along the road from Km 154/400 to Km 169/300 (LHS), Km 178/600 to Km 183/230 (LHS), Km 185/400 to Km 203/000 (LHS), Km 203/000 to Km 203/500 (RHS) and across the road at Km 162/300, Km 163/340, Km 165/000 & Km 185/400, Km 195/200, Km 203/000 of NH-67 for a total length of 37.630 Km by M/s. Reliance Jio Infocomm Limited, Chennai along Trichy - Karur Section of NH-67 in the State of Tamil Nadu
  • Proposal for the work of Permission for laning of 4" diametL'r steel underground Natural gas pipeline under city Gas Distribution (cGD) project from Porrda to Tisca atong NH-4A in the state of Goa
  • Access Permission for New Petol Pump of M/s.BPCL on G.No.61(P) of Village-Deulghat, Tal & Dist- Buldana on Ajantha-Buldana road section of NH-753-E at Km.44/250 on RHS in the State of Maharashtra
  • Access Permission for New Petrol Pump of M/s.lOCL on S.No.49311 of village-Kasabe Vani, Tatuka-Dindori Dist-Nashik on Pimpaigaon'Vani'Saputara road NH-ts3 at Km.83/341 to 83/374 on RHS in the State Maharashtra
  • Access Permission for New Petrol Pump Retail Outlet M/s'HPCL on s.no,66/(P) of vittage-Parite,Tat-Madha Dist-Sotapur on Nagar-Karmala- Tembhurni-pandhaiprilfi"ng"f*edha-Vijapur road NH-561 at Km'7/680 to Km.7t745 on RHS in the State of Maharashtra
  • Proposal for access permission for approach roads at km 138/007 to 138/042 (LHS) on NH-326 to the proposed Retail Outlet of Smt. Menaka Sabar (Applicant of IOCL) at Mouza-Muchkapadar, Tahasil-Padmapur, Dist-Rayagada in the state of Odisha
  • Invitation of public comment: Proposal for access permission for approach roads at km 95/144 to 95/179 on NH-353 to the proposed Retail Outlet of Shri Baisampayan Sahu (Applicant of IOCL) at Mouza-Palsipani, Tahasil-Komna, Dist-Nuapada in the state of Odisha
  • Invitation of public comment: Proposal for access permission for approach roads at km 122/537 to 122/577 (RHS) on NH-55 to the proposed Retail Outlet of Shri. Shyama Sundar Pradhan (Applicant of BPCL) at Mouza-Maratira, tahasil-Banarpal, Dist-Angul in the state of Odisha
  • Permission for taying oFC onPermission lay oPtical Fibre cable along Akola- Akoi-Gandhigram-Sangvi monaJi t pint Road on NH-161-A km.13/850 to Z4l200 total sectin tengtlifor ROVlapplied 10.350 km.in the state of Maharashtra
  • Permission for overhead crossing high tension transmission line 220 KV DC on NH-68 between chainage no.60 and 100 (exact location 28.Km. from Jaisalmer & 10 km from Devikot) I near village Choor, Tehsil & District - Jaisalmer in the state of Rajasthan
  • Permission of Road crossing of NHAI at Ch. 66.800 Km. of NH-21(old NH-11) from Ludhawai toll to Mahua Sinpini in the state of Rajasthan
  • Permission of crossing of NH for providing 132 TSS Overhead line (Senthi-Bojunda Line) in the state of Rajasthan
  • Permission of Road crossing of NHAI at Ch.68.680 Km. of NH-21 (old NH-11) from Mahua Sinpini to Bansi Khurd in the state of Rajasthan
  • Permission for taying on NH-353-D, KanPa to BramhaPuri section along m'erroo (Kanpa to Km.l 18/oo (Bramhapuri T point),& across at km.83/00( Kanpa & 118/OO (Bramhapuri-T Point) a total tengh of 35.00 km Tahsil-Nagbhid,Dist-chandrapurin the state of Maharashtra
  • Permission for laying OFC Line M/s.Sterlite technologies Limited, E, lndustrial area,Waluj, Aurangabd, from km.0/00 to 18/00 km.Along NH-161-G.in the state of Maharashtra
  • Permission for laying oFc Line M/s.sterlite technologies Limited, E, lndustrial .r"i,W"lr;, Aurangabad, from tm.+OfOSO to 27 t25O km'Along NH-151-A'in the state of Maharashtra
  • Requisition submitted to get road crossing for the purpose of laying optical fiber cable for BBNL NOFN Project from village - Dingai, District - Pali Marwar NH - 162 Ch. in Km. 129/300 in the state of Rajasthan
  • Requisition submitted to get road crossing for the purpose of laying optical fiber cable for BBNL NOFN Project from village - Sanpa, Dstrict - Pali Marwar NH - 162 Ch. in Km.97.650/99.790 in the state of Rajasthan
  • Issue of Access permission for construction an approach road to the proposed new Petrol / diesel retail outlet in Resurvey No.40/9B in Elathur Village, Kozhikode Taluk, Kozhikode District at Km.6/280 (LHS) in Calicut bypass on NH-66(Old NH 17) of Kerala State by M/s Hindustan Petroleum Corporation Limited
  • Issue of Access permission for construction an approach road to the proposed new Petrol / Diesel retail outlet in Re-Survey No.39/1/2, 39/1/12, 39/1/13 of Kottamkara Village, Kollam Taluk, Kollam District at Km.8.300(RHS) on NH-208(New NH-744) of Kerala State by M/s Essar Oil & Gas
  • Proposal for access permission to Indraprastha Gas Limited New CNG Service Station, Delhi – Jaipur Road at km 41.146 (LHS) (New NH-48), Village Kherki Daula, Tehsil, Manesar, Distt. Gurgaon
  • Permission for laying Fiber Cable from NH-79 MS.140.100 for Total Section of 50.100 Kms. Gulabpura to Bhilwara (ROW) applied the state of Rajasthan
  • Permission for laying underground Optical Fiber Cable from Panduka Charodham Chowk to Muhera Chowk, Ch. 39.00 to Ch. 54.00 section of NH-130C in the State of Chhattisgarh
  • Permission for Erection of 110 KV DC line towers from Thingalur 230KV SS to Thiruvachi 110 KV SS with Panther ACSR conductor crossing NH-47 at Km.73.914 between Salem – Coimbatore section at Thiruvachi village by M/s. Tamil Nadu Transmission Corporation, Perundurai
  • PIU, Salem - Request for permission to laying of Water Pipeline along the road from Km 5/780 to Km 11/270 (LHS) & Km 13/400 to Km 18/740 (LHS) of NH-79 - (Salem - Ulundurpet section) for a length of 10.830 Kms by the Executive Engineer, M/s. Tamil Nadu Water Supply and Drainage Board, Maintenance Division, Salem