Sorry, you need to enable JavaScript to visit this website.
Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
S. No. State Subject Issue Date
241 Odisha Permission for laying of water pipeline across NH-26 at 21 locations between km 227/400 (Moter) to km 259/000 (Ampani Ghat) under Mega pipe water supply project in Kalahandi district (3.71 Mb application-pdf)
18-07-2025
242 Odisha PermIssion for laying of water pipeline across NH-26 at 8 locations between km 194/790 (Jairing) to 224/350 (Charbahal) under Mega pipe water supply project in Kalahandi district (5.63 Mb application-pdf)
18-07-2025
243 Uttar Pradesh Proposal for permission underground road crossing of water pipeline at Design Km. 02.215, Km. 05.100, Km. 08.215 & Km. 10.100 and Existing Km. 49.920, Km. 52.153, Km. 53.912 & Km. 60.192 in District Aligarh on NH-334D (Aligarh-Palwal section) in the State of Uttar Pradesh (82.06 Kb application-pdf)
18-07-2025
244 Karnataka Permission for laying of pipeline along the National Highway NH-50 (Vijaypur-Hospet Section) on RHS from CH Km.318+175 to Km.323+000 of 200mm diameter DI pipes along the Highway by open trench method (109.08 Kb application-pdf)
18-07-2025
245 Uttar Pradesh Proposal for 765 KV S/C (Quad) Mainpuri Unnao Transmission Line Overhead crossing at Ch. 401+470 on NH-34, Aligarh-Kanpur Section in the State of Uttar Pradesh (365.18 Kb application-pdf)
18-07-2025
246 Uttar Pradesh Regarding permission and No objection for laying/ crossing of water supply pipeline at Chainage No. 129+420 & 130+475 (across the road) at Chainage No. 128+840 to 129+770 & 129+770 to 130+475 (LHS) on NH-34 (Kanpur Kabrai Marg) under Kabrai Nagar Drinking water scheme, District-Mahoba (U.P.) (399.25 Kb application-pdf)
18-07-2025
247 Tamil Nadu Proposal for laying of underground water pipe line (Trenchless crossing) at Km 194/100 & Km 195/900 across Kayathar-Kanyakumari section of NH-44 (Old NH-7) (4.14 Mb application-pdf)
18-07-2025
248 Tamil Nadu Erection of 33 KV Electrical Cable Line with Baby Tower and crossing at Km 253/940 (8.23 Mb application-pdf)
18-07-2025
249 Uttar Pradesh Proposal for laying of 11 KV Line, Over Head 11KV ACSR Rabbit & Weasel Conductor Cable from RHS Km.24+900 to Km. 27+100 (2200m) Km 38+220 to Km 38+850 (630m) &Km 42+987 to Km 43+440 (453m) RHS & LHS Crossing by HDD Method at Km.25+300 on NH-09 Rampur to Rudrapur section at District-Rampur in the State of Uttar Pradesh (1.26 Mb application-pdf)
18-07-2025
250 Rajasthan Regarding permission for overhead crossing of Jaipur-Bikaner (NH-52) at crossing chainage (338 km-340 km) by under construction 765 kv D/C Bhadla-III Sikar-II Transmission Line (Part-III) (703.42 Kb application-pdf)
17-07-2025

Pages