Sorry, you need to enable JavaScript to visit this website.
Internship of B.Tech/ M.Tech Civil Engineering students in National Highway Projects
S.No. Subject दिनांक
41 Debarment of M/s Ceigall India Limited - Patel Engineering Limited (JV) from engagement on NHAI or Centrally sponsored Road Works projects for a period of Six Months (i.e. for the period 30.05.2022 to 29.11.2022) (755.49 Kb application-pdf) 11-10-2022
42 Construction of 8 lane Dwarka Expressway from Delhi-Haryana Border to start of Rail over Bridge, Gurugram (Chainage from km 9+500 to km 19+700) in the state of Haryana (NH-248BB) Package-III on EPC mode-Action against Personnel of Contractor (172.88 Kb application-pdf) 06-10-2022
43 Minutes of the Meeting of the 41st Transport Development Council (TDC) meeting held on 9th September, 2022 in Bengaluru, Karnataka (4.41 Mb application-pdf) 30-09-2022
44 Department related Parliamentary Standing Committee on Transport, Tourism and Culture- Action Taken Replies on recommendations /observations contained (Para 92 of the 317th Report) -Necessary Direction/advisory to tackle the problem of stray cattle and other animals trespassing National Highways (1.02 Mb application-pdf) 22-09-2022
45 Highway Rating Criteria and Methodology with detailed SOP for un-divided carriageway upto 2-lane with paved shoulders on National Highway (1.88 Mb application-pdf) 22-09-2022
46 Remuneration of professional staff claimed by the consultancy firms (960.71 Kb application-pdf) 20-09-2022
47 Memorandum of Understanding (MOU) for proposed implementation of ROBs/ RUBs on State Roads under CRIF Scheme under “SETU BANDHAN” Programme – Signing of Tripartite MOU - Standard Operating Procedure (SOP) (23.73 Mb application-pdf) 15-09-2022
48 Consultancy services for Authority's Engineer for supervision of following two Projects. (i) Widening of Pachpadra-Bagundi section to 4 lane of NH-25 on EPC Mode and (ii) 4 lane divided carriageway from km 0.000 (km 144.200 of NH-15 (New NH-68) to km 21.042 (km 160.700 of NH-15 (New NH-68) barmer Bypass of NH-15 (New NH-68) on EPC Mode in the state of Rajasthan-Intimation regarding adverse action/ debarment/ blacklisted/ non-performance of the firms/ Key Personnel (1.69 Mb application-pdf) 15-09-2022
49 Construction of Subway/FOB/Footpath along with ROB for closure of Level Crossing (3.97 Mb application-pdf) 14-09-2022
50 G.S.R. 695(E) regarding RVSF amendment rules, to amend G.S.R. 653(E) (1.74 Mb application-pdf) 13-09-2022

Pages