Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
4711 Gujarat Six-laning of Ahmedabad to Vadodara section of NH-8 from Km 6+400 to Km 108+700 (Length 102+300 Kms) and Improvement of Ahmedabad-Vadodara Expressway from Km 0+000 to Km 93+302 in the State of Gujarat (Length 93+302 Kms) under NHDP Phase-Von DBFOT Toll Basis.Proposal for ROW Permission for laying of 66 KV XLPE cable along NH-48 from Km 8+600 to Km 6+400 at District Ahmedabad on Ahmedabad-Vadodara Section of NH-48 in the State of Guiarat (1.02 Mb application-pdf)
27-07-2021
4712 Telangana Proposals for permission for laying of OFC by M/s Telangana Fiber Grid Corporation limited along NH-163 in Warangal-Bhupalpatnam Section from Ch.170.360 to Ch. 258.200 for 55.68 km in the State of Telangana (472.12 Kb application-pdf)
27-07-2021
4713 Andhra Pradesh Operation and Maintenance of 4 lane divided carriageway facility of Tada – Nellore (Km. 52.8 to Km. 163.6) section of NH-5 constructed on BOT basis in Andhra Pradesh - Permission for laying of telecom ducts / Optical Fibre Cable (OFC) from Km. 54/383 to Km. 81/500 (4.81 Mb application-pdf)
27-07-2021
4714 Karnataka Proposal seeking permission for construction of Kajibilagi West Canal crossing at Km 31.90, Km 30.35, Km 28.45 & Km 27.10 of NH-548B Vijayapur- Athani section by Karnataka Neeravari Nigam Ltd (1.38 Mb application-pdf)
27-07-2021
4715 Andhra Pradesh Operation and Maintenance of 4 lane divided carriageway facility of Tada – Nellore (Km. 52.8 to Km. 163.6) section of NH-5 constructed on BOT basis in Andhra Pradesh - Permission for laying of underground Optical Fibre Cable (OFC) from Km. 54/383 to Km. 107/200 (LHS) also a crossing at Km. 81/050 (LHS-RHS) for a total length of 52.844 Kms (3.74 Mb application-pdf)
27-07-2021
4716 Andhra Pradesh Proposal of M/s. Atria Convergence Technologies Limited for Laying of Optical Fiber Cable (OFC) using HDD & open trench methods along NH-16 f rom Km.699.900 to Km.700.500 on RHS (600m) and from Km.700.800 to Km.701.700 on LHS (900m) and across at Km.700.800 (60m) & Km.700.500 (60m) for a total length of 1620m in Visakhapatnam District in the State of Andhra Pradesh (5.41 Mb application-pdf)
27-07-2021
4717 Andhra Pradesh Permission for Laying of Optical Fiber Cable (OFC) using HDD & open trench methods along NH-16 from Km.699.900 to Km.700.500 on RHS (600m) and from Km.700.800 to Km.701.700 on LHS (900m) and across at Km.700.800(60m) & Km.700.500(60m) for a total length of 1620 in Visakhapatnam District in the State of Andhra Pradesh (241.83 Kb application-pdf)
27-07-2021
4718 Telangana Proposals for permission for laying of OFC by M/s Telangana Fiber Grid Corporation limited along NH-65 from Ch. 35.800 to Ch. 40.000 for 4.260 Km in the State of Telangana (491.29 Kb application-pdf)
27-07-2021
4719 Tamil Nadu Operation and Maintenance of Madurai – Aruppukottai section from Km.138.800 to Km.266.865 of NH-45B in the State of Tamil Nadu – Erection of 400 KV Overhead Electrical line crossing at Km.243+790 in Near Kurukkusalai village by TANTRANSCO (454.04 Kb application-pdf)
26-07-2021
4720 Maharashtra Four laning of Pune Solapur section of NH-65 (Old NH-09) from Km. 150.050 to Km. 251.325 in tha State of Maharashtra under NHDP Phase III Pkg. II on DBFOT basis- Permission to carry out Horizontal Direct Drilling (HDD) for laying of 11 KV electrical cable at Km. 205+377 and Km. 205+378 under Project Pokharapur Lift Irrigation Scheme on Pune Solapur section of NH-65 in the State of Maharashtra (4.43 Mb application-pdf)
26-07-2021

Pages