Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
4251 Chhattisgarh Permission for lay Optical Fiber Cable along Abhanpur Bus Stand to Gulab Garden Gobra Nawapara,Ms: Kms 0.00 to Ms: Kms 15.00 on NH-130,total section length ROW applied for 15.00 Kms. in the State of Chhattisgarh (918.96 Kb application-pdf)
18-06-2021
4252 Maharashtra NHAI-PIU-NSK- Widening of existing 2 lane carriage way to 4/6 lane carriageway configuration for Dhule – Pimpalgaon (Km 265.00 to Km 380.00) section of NH-3 in the State of Maharashtra – M/s. Telesonic Network Ltd.’s (Airtel) proposal for laying OFC from Km. 263.100 to Km. 263.800 (LHS) Length 0.7 Km & Crossing at Km. 263.800 across NH-3 (119.07 Kb application-pdf)
17-06-2021
4253 Odisha Permission for crossing NRL's 28" diameter (712 mm) Crude Oil Pipeline encased with 36" diameter (915 mm) Casing Pipe along with 6" diameter (153 mm) OFC duct I cable, as an integral part of Crude Oil Pipeline crossing across the National Highway-5A by Horizontal Boring Method at NH design chainage 70+.95Km.in Village-Kathaara 243,Tehsil Kujanga in Jagatsinghpur-HDD crossing at Km.70+095(on NH-5A) Chandikhol-Paradip section (1.54 Mb application-pdf)
17-06-2021
4254 Odisha Rehabilitation and up-gradation of existing 2 lane to 4-lane standards of Rimuli (Km 163.000) to Koida (Km 206.200) Section of NH-215 (New NH-520), i.e. Package-I in the State of Odisha on EPC Mode under NHDP Phase-Ill on EPC Mode-Regarding approval for 500mm width of Right way(ROW),for laying of return water Pipeline in NH-520 Utility Corridor from Ch:163.000 km to 182.300Km(Rimuli to Kalapahar Railway bridge),for slurry Pipeline project of Tata Steel Ltd,Kalinganagar (1.60 Mb application-pdf)
17-06-2021
4255 Andhra Pradesh Grant of permission for laying of 12.75” dia Natural Gas Pipeline by M/s. IOCL with 89mm dia OFC along NH-16 from Km.733.885 to Km.741.256 for a length of 7371mt. (10.19 Mb application-pdf)
17-06-2021
4256 Odisha Rehabilitation & Up gradation of Cuttack- Angul section of NH-42 (New NH-55) to 4-lane in the State of Odisha under NHDP-1I1on EPC Mode Package-II- Proposal for crossing of 600 mm dia slurry pipeline with OFC duct through 1000 mm dia casing pipe from RHS to LHS of NH-55 at Chainage 77.975 from proposed MTPA iron ore beneficiation plant located at Village-Bhanjapalli and Teherei to Dhenkanal Steel Plant of M/s Rungta Mines Ltd. (1.75 Mb application-pdf)
17-06-2021
4257 Maharashtra Proposal for Permission for laying Optical Fiber Cable line of M/s Reliance Jio Info Pvt Ltd Ahmedabad from Km, 34/00 to 49/00 ( Himayatnagar to Islapur) along and Across NH 161 A in the state of Maharashtra (389.66 Kb application-pdf)
16-06-2021
4258 Maharashtra Proposal of Permission for laying Optical Fiber Cable line of M/s Reliance Jio Info Ltd Mumbai from Km, 49/600 to 81/600 (Islapur Phata to Bendi Tanda) along and Across NH 161 A in the State of Maharashtra (394.77 Kb application-pdf)
16-06-2021
4259 Maharashtra Proposal for Permission for laying optical fiber cable line M/s Reliance jio Infocom PVT Ltd Ahmedabad from Km, 17/200 to 40/390 (Chikali Halda road to Mukhed) along and Across National Highway NH-161A in the State of Maharashtra (411.37 Kb application-pdf)
15-06-2021
4260 Maharashtra Re-Proposal for permission of laying underground Public Utility Services Natural Gas Pipeline 5" Dia along and across the NH 753 F at Bhugaon from Bharat Petroleum Km, 8/450 to Siddhi Lawns Km, 3/580 on RHS and from forest Trail Km, 5/780 to Ellora Wines km, 2/750 on LHS and one crossing at Forest Trail KM, 5/780 Total Length 7700 Mt in the State of Maharashtra (437.02 Kb application-pdf)
15-06-2021

Pages