Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
3701 Maharashtra Proposal for laying underground Telecom Cable at NH-6 RHS Jalgaon Road Chainage km 518/300 to LHS km 520/200 total length 1.9 km (544.65 Kb application-pdf)
20-05-2022
3702 Telangana NHAI - RO Hyderabad - PIU Khammam- Proposal for laying of Optical Fiber Cable for a total length of 5.65 Km from Km.?05+563 ta Km,.?1?+02? (RHS) along NH-563 by Open trench Methodology and Highway crossings by HDD methodology at Km.206+463, Km. 209+913, and Km, 212+022 on Warangal to Khammam section of NH-563 in the State of Telangana (3.91 Mb application-pdf)
20-05-2022
3703 Telangana NHAI - RO Hyderabad - PIU Khammam- Proposal for laying of Optical Fiber Cable for a total length of 10.53 Km from Km.146+050 to Km.146+800 (RHS), Km. 167+400 to Km.175+000 (RHS), and Km. 175+000 to Km. 177+000 (LHS), along NH-563 by Open trench Methodology and Highway crossings by HDD methodology at Km.167+400, Km. 167+650, Km. 174+450, Km. 171+460, Km. 174+850, and Km. 175+000 on Warangal to Khammam section of NH-563 in the State of Telangana (8.29 Mb application-pdf)
20-05-2022
3704 Haryana 4 laning of Kaithal Rajasthan Border Section of NH-152/65 from Km. 33.250 (Design km. 0.500) to km. 241.580 (Design Km. 165.759) in the State of Haryana under NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate & Transfer ("DBFOT") Toll basis- Permission for Laying of underground pipeline of 700mm diameter crossing NH-52 at Km. 142.571 near Siwani Town District Bhiwani in the State of Haryana by HDD method (2.71 Mb application-pdf)
20-05-2022
3705 Chhattisgarh Proposal for NOC for the pipeline carrying drinking water from Labhandih Chowk to Bhatagaon Chowk via Telibandha chowk, Pachpedi Naka from Km. 266.09 to Km. 273.57 at NH-06 under Mission Amrut Phase-II In NH-06 (New NH-53) (2.79 Mb application-pdf)
20-05-2022
3706 Telangana NHAI - RO Hyderabad - PIU Nirmal- Proposal for laying of Optical Fiber Cable for a total length of 3.33 Km from Km.450+475 to Krn.452+225 (LHS), and Km.461+140 to Km.462+600 ({RHS), along NH-44 by Open trench Methodology and Highway crossings by HDD methodology at Km.450+475 and Km. 4524225 on Nagpur ta Hyderabad section of NH-44 in the State of Telangana (5.72 Mb application-pdf)
20-05-2022
3707 Andhra Pradesh RO - Vijayawada - Permission for laying of OFC Cable (M/s. Andhra Pradesh State Fiber Net Limited) using HDD Method across the road of NH-65 at Km. 11/250, Km. 13/465 and Km.21/100 for a total length of 180 mtrs (Across the road each 60 mts) in Kankipadu and Vuyyuru Mandals, Machilipatnam, Krishna District of Vijayawada - Machalipatnam section of NH-65 (5.08 Mb application-pdf)
20-05-2022
3708 Andhra Pradesh RO - Vijayawada - Permission for laying of OFC Cable (M/s. Andhra Pradesh State Fiber Net Limited) using HDD Method across the road of NH-65 at Km. 31/600, Km.38/600, Km.45/980, Km.51/900, Km.55/250 and Km. 63/670 for a total length of 360 mtrs (Across the road each 60 mts) in Vuyyuru Pamarru, Movva, Guduru and Machilipatnam Mandals, Machilipatnam, Krishna District of Vijayawada -Machalipatnam section of NH-65 (5.34 Mb application-pdf)
20-05-2022
3709 Jharkhand Permission to lay 12” dia Natural Gas Pipeline along with OFC Cable across National Highway-320 at Ch. Km. 24+390 & Pipeline Ch. 1+129 for Tie-in Connectivity of ONGC Bokaro into JHBDPL Network (180.77 Kb application-pdf)
20-05-2022
3710 Maharashtra NHAI-PIU-NSK- Six Laning of Pimpalgaon-Nashik-Gonde section of NH-3 from Km 380.000 to 440.000 in the State of Maharashtra - Maharashtra Natural Gas Limited’s (MNGL) Proposal for laying Gas Pipeline from Km. 411.382 to Km. 409.200 (LHS) and Km. 409.200 to Km. 406.100 (RHS), Total length- 5.282 Km & 2 Crossing at Km. 409.200 & Km. 406.100 on NH-3 (549.16 Kb application-pdf)
18-05-2022

Pages