Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
3191 Jharkhand Permission to lay 12” dia Natural Gas Pipeline along with OFC Cable across National Highway-320 at Ch. Km. 24+390 & Pipeline Ch. 1+129 for Tie-in Connectivity of ONGC Bokaro into JHBDPL Network (180.77 Kb application-pdf)
20-05-2022
3192 Andhra Pradesh Grant of ROW permission for laying of underground 125mm dia MDPE pipeline along NH-71 from Ch. 178/450 to Ch. 179/770 (length 1320 mtrs) on LHS by open cut method and 4” dia steel pipeline & 125mm dia MDPE pipeline in one trech along NH-71 from Ch. 179/770 to 182/270 (length 2500 mtrs.) by open cut method and 125mm dia MDPE pipeline along NH-71 from Ch. 179/680 to Ch. 182/270 (length 2590m) on RHS by open cut method & two crossings for 4” dia steel pipeline (Casing pipe 8” dia), one at Ch. 178/450 (width 60 mtrs) and another one at Ch. 179/810 (width 30 mtrs) on NH-71 by HDD Method (6.20 Mb application-pdf)
20-05-2022
3193 Karnataka Laying of underground 12” Steel Gas Pipeline along NH-50 from Km.360.275 to Km.415.000 and across at Km.375.951 and Km.377.192 and installation of underground sectionalizing Valve (Chamber Size 2.85 m x 2.40 m) in Bidar and Gulbarga District (405.57 Kb application-pdf)
20-05-2022
3194 Odisha Rehabilitation and up-gradation of existing 2 lane to 4-lane standards of Rimuli (Km 163.000) to Koida (Km 206.200) Section of NH-215 (New NH-520), Le. Package-lin the State of Odisha on EPC Mode under NHDP Phase-Ill on EPC Mode & Rehabilitation and up-gradation of existing 2 lane to 4- lane standards to Koida (Km.206.200) to Rajamunda (km.259.453) Section of NH-215 (New NH- 520), ie., Package-ll in the State of Odisha under NHDP Phase Ill on EPC Mode- Request for installing 600mm Dia Pipe Conveyor and 33 kV insulated cable over an overhead structure with 1700mm width along the LHS of NH Utility Corridor in Rimuli- Rajamunda section of NH- 520 from Km.204.000 to Km.212.000 by M/s JSW USL (7.62 Mb application-pdf)
20-05-2022
3195 Maharashtra Four Ianing of Tarsod to Fagne section of NH-6 from km 422.700 to km 510.000 in the State of Maharashtra to be executed as Hybrid Annuity Mode (DBFOT Annuity) Pattern under NHDP Phase-IV (Package-II-B)-Permission of laying and crossing of OFC of M/s Jio Digital Fiber Pet. Ltd. Across National Highway NH-53 for the total length of 6.240 km at Jalgaon city and Nahata Chowk (198.20 Kb application-pdf)
20-05-2022
3196 Maharashtra Proposal for laying underground Telecom Cable at NH-6 RHS Jalgaon Road Chainage km 518/300 to LHS km 520/200 total length 1.9 km (544.65 Kb application-pdf)
20-05-2022
3197 Telangana NHAI - RO Hyderabad - PIU Khammam- Proposal for laying of Optical Fiber Cable for a total length of 5.65 Km from Km.?05+563 ta Km,.?1?+02? (RHS) along NH-563 by Open trench Methodology and Highway crossings by HDD methodology at Km.206+463, Km. 209+913, and Km, 212+022 on Warangal to Khammam section of NH-563 in the State of Telangana (3.91 Mb application-pdf)
20-05-2022
3198 Telangana NHAI - RO Hyderabad - PIU Khammam- Proposal for laying of Optical Fiber Cable for a total length of 10.53 Km from Km.146+050 to Km.146+800 (RHS), Km. 167+400 to Km.175+000 (RHS), and Km. 175+000 to Km. 177+000 (LHS), along NH-563 by Open trench Methodology and Highway crossings by HDD methodology at Km.167+400, Km. 167+650, Km. 174+450, Km. 171+460, Km. 174+850, and Km. 175+000 on Warangal to Khammam section of NH-563 in the State of Telangana (8.29 Mb application-pdf)
20-05-2022
3199 Haryana 4 laning of Kaithal Rajasthan Border Section of NH-152/65 from Km. 33.250 (Design km. 0.500) to km. 241.580 (Design Km. 165.759) in the State of Haryana under NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate & Transfer ("DBFOT") Toll basis- Permission for Laying of underground pipeline of 700mm diameter crossing NH-52 at Km. 142.571 near Siwani Town District Bhiwani in the State of Haryana by HDD method (2.71 Mb application-pdf)
20-05-2022
3200 Chhattisgarh Proposal for NOC for the pipeline carrying drinking water from Labhandih Chowk to Bhatagaon Chowk via Telibandha chowk, Pachpedi Naka from Km. 266.09 to Km. 273.57 at NH-06 under Mission Amrut Phase-II In NH-06 (New NH-53) (2.79 Mb application-pdf)
20-05-2022

Pages