2951 Rajasthan Proposal for grant of permission for laying 33 KV Transmission line along NH-8 (New NH-58) of Kishangarh-Ajmer-Beawar sec. from Km. 45+535 (LHS) to 45+995 (RHS) and crossing at Ch. 45.855, (Total length = 520m), at Village-Tabiji, District-Ajmer in the State of Rajasthan by Ajmer Development Authority, Ajmer(ADA) (3.18 Mb application-pdf)
29-03-2023
2952 Uttar Pradesh Proposal for the permission of laying U/G 300mm ø Steel Pipe Line (PSL 2, X-46, 7.1mm THK) from Ch.58.443 to Ch.83.030 (RHS) (Total Length-24587.00M) along NH-509 (Moradabad-Agra Section) at Village-Koil, Tehsil-Gunnaur, District-Sambhal in the State of Uttar Pradesh (3.61 Mb application-pdf)
29-03-2023
2953 Uttarakhand Permission sought by M/s Uttarakhand Urban Sector Development Agency for laying of 9”dia HDPE sewer pipeline from Km.158+900 (Mohakampur) to Km.161+719 (Nakronda Police Chauki) section of NH-72 (New NH-7) for total length of 3285.4m in Dehradun in the State of Uttarakhand (2.28 Mb application-pdf)
29-03-2023
2954 Uttar Pradesh Permission for laying proposed 6" & 8" Dia Gas Pipeline with OFC Along NH-30 Pilibhit Road) From Design Ch. 0.000 Km to Design Ch. 0.380 Km LHS, From Existing Ch. 328.900 Km to Existing Ch. 324.700 Km LHS, From Design Ch. 4.7 Km to Design Ch. 6.600 Km LHS, From Design Ch. 6.600 Km to Design Ch. 11.060 Km RHS, From Existing Ch. 318.340 Km to Existing Ch. 306.480 Km RHS, From Design Ch. 23.400 to Design Ch. 28.160 Km RHS, From Existing Ch. 301.720 Km to Existing Ch. 292.720 Km RHS & across At Existing Ch. 325.810 Km, At Design Ch. 6.600 Km, At Existing Ch 318.340 Km, At Existing Ch. 309.440 Km& At Existing Ch. 299.100 Km to develop CGD Network in Pilibhit District of Uttar Pradesh State (8.92 Mb application-pdf)
29-03-2023
2955 Odisha Rehabilitation and Upgradation of Four laning of Binjhabahal-Telebani Section, Km.414.000 to Km.491.710 (Design Chainage Km.414.982 to Km.493.300) of NH-6 (New NH-49) in the State of Odisha under NHDP-IV on Hybrid Annuity Mode (1.46 Mb application-pdf)
29-03-2023
2956 Haryana 4-laning of Rohtak-Panipat section NH-71A from km. 0.00 (km.63.300 of NH-10) to km. 80.858 (km.83.500 of NH-1) in the state of Haryana on DBFOT Basis under NHDP Phase-III –NOC proposal for Laying of 600mm diameter Sewerage pipeline along the Panipat-Rohtak Section of old NH-71A (New NH-709) from km 13.658 to km 15.008 in the State of Haryana by open trench method (367.81 Kb application-pdf)
29-03-2023
2957 Jharkhand Proposal of Access Permission for laying of DW&SD Water Supply Pipe Line along & across the NH-33 for "Ghoranegi and adjoining villages Rural water Supply Scheme, Saraikela" (765.24 Kb application-pdf)
29-03-2023
2958 Odisha ROW permission for 33 KV line laying and crossing through underground and overhead between Km. 71+438 to Km. 75+740 along with NH-18 and one underground crossing at Km. 71+438 in Mayurbhanj District in the State of Odisha (1.17 Mb application-pdf)
29-03-2023
2959 Rajasthan Construction of Khetri-Bhiwadi 400 KV/D/C Transmission Line (Twin HTLS) Associated with transmission scheme for evacuation of Power from Solar Energy Zone in Rajasthan (8.1) GW under Phase-II Part-F through Traffic Based competitive Bidding (TBCB) route-Proposal for Power Line Crossing (318.90 Kb application-pdf)
29-03-2023
2960 Rajasthan Proposal for grant of permission for construction of 765KV D/C Fatehgarh-II to Bhadala-II 2nd Transmission line overhead crossing NH-125 (Joshpur-Pokaran section, NH-114, New NH-125) between Km. 140+619 & 141, near Village-Dediya, District-Jodhpur in the State of Rajasthan by M/s. PGCIL (3.14 Mb application-pdf)