Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
2571 Gujarat Proposal for permission for laying 125 mm dia. PE Gas Pipeline parallel from Rajrajeswaridham Jankhan to Ahmedabad Seamless Industries near Kankapura Village Tal.- Limdi, District-Surendranagar along NH-47 (Ch. 86/350 to 101/740) in the State of Gujarat (1.02 Mb application-pdf)
17-02-2023
2572 Uttar Pradesh Proposal for NOC permission for laying & crossing of water supply pipeline in Km.48.300 to km.80.300 (Atarra road) of NH-35(76) by trenchless HDD method at village & Tehsil-Atarra & District-Banda in the State of Uttar Pradesh (2.15 Mb application-pdf)
17-02-2023
2573 Uttar Pradesh NOC for 11 KV feeder line through Underground cable by crossing NH-334(Meerut-Muzaffarnagar) at Ch. 84.650 including overhead feeder line along the NH-334 for electrical connection to DFFCIL Crossing station & New Sakoti (4.21 Mb application-pdf)
17-02-2023
2574 Uttar Pradesh NOC for 11 KV feeder line Underground 11 KV cable by crossing of NH-334 (Bulandshahar-Hapur) at Km 46.635 including overhead feeder line along the NH-334 for electrical connection to DFCCIL new Gulaothi crossing station. (4.18 Mb application-pdf)
17-02-2023
2575 Gujarat Proposal for permission for crossing of NH-168 providing 66KV S/C of overheard line from existing 220 KV Thavar SS to Exi. 66 KV rah SS O/H at Ch. 24/875 (between 24/0 to 25/0) near village Rah, Tal.- Tharad, District- Banaskantha in the State of Gujarat (1.02 Mb application-pdf)
16-02-2023
2576 Odisha Rehabilitation & Upgradation of Cuttack- Angul section of NH-42 (New NH-55) to 4-lane in the Stale of Odisha under NHDP-lIl on EPC Mode Package-Il- Permission for laying of 33KV ubderground line on NH-55 km. 66+150 to km. 67+760 to energize 33/11 kv sub-station newly construction at village Badandha under ODSSP scheme by OPTCL (1.60 Mb application-pdf)
16-02-2023
2577 Uttar Pradesh NOC for crossing of 11 kV Feeder line through underground cable at Chainage 51.101 & Erection of Poles from Ch.51.010 to Ch.51.320 (LHS) & from Ch.51.010 to Ch.51.250 (RHS) on NH-24 (New NH-09) for electrical connection to DFFCIL Crossing station & New Hapur Station (4.02 Mb application-pdf)
16-02-2023
2578 Uttar Pradesh Proposal for permission for laying of Carbon Steel Underground Gas Pipeline along to NH-19 for providing connectivity to Nitish Yadav CNG Station near Rupaspur, District-Firozabad (from Ch.251+940 (19+940) km to Ch.255+660 (23+660) km.) in the State of Uttar Pradesh (7.11 Mb application-pdf)
15-02-2023
2579 Uttar Pradesh Permission for crossing of 02 nos. 11 KV, XLPE Cable through (160mm dia pipe) HDD Method Gyondi Feeder 33/11 KV Crossing of NH-34 at Km.113.7 & 114.4 underpass near Khanna, Mahoba in the State of Uttar Pradesh (6.34 Mb application-pdf)
15-02-2023
2580 Uttar Pradesh Permission for crossing of 02 Nos. 11 KV XLPE cable through (160mm dia pipe) HDD Method for Agriculture Consumers and associated works in District-Hamirpur for 33/11 KV crossing of NH-34 at Km. 77.1 & Km. 97.4 near Nazarpur underpass in District-Hamirpur in the State of Uttar Pradesh (6.29 Mb application-pdf)
15-02-2023

Pages