Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
2471 Maharashtra Widening of existing 2 lane carriageway to 4/6 lane carriageway configuration for Dhule–Pimpalgaon (Km 265.00 to Km 380.00) section of NH-3 in the State of Maharashtra (103.49 Kb application-pdf)
17-10-2023
2472 Gujarat Proposal seeking ROW permission for Crossing of Drinking Water Supply Pipeline at Km 503+500,Km 517+900 & Km 520+100 on NH-27 in the State of Gujarat (1.16 Mb application-pdf)
16-10-2023
2473 Chhattisgarh Proposal of NOC for Overhead Crossing of National Highway (NH-43) between milestone 351 Km & 352 by 132 KV DCSS Line from 220/132 KV S/s CSPTCL Bishrampur to proposed Switchyard of 3x8.33 MW SHP Project Rehar-1 at Village-Pasal, Tehsil & District-Surajpur (1.45 Mb application-pdf)
13-10-2023
2474 Haryana Four laning of Rohtak to Hisar section of NH-10 (from km 87+000 to km 170+000) including connecting link from Km 87+000 (NH-10) to Km 348+000 (NH-71) to be executed as BOT (Toll) Project on DBFOT Pattern under NHDP Phase-III in the State of Haryana-NOC case for permission of laying of storm Water Pipeline (02 Nos. Parallel 1000MM dia HDPE Pipe) at Km.180.499 to 182.560 (LHS) (Total Length of 2061M) on NH-09 (Old NH-10) Rohtak-Hisar section at District-Hisar in the State of Haryana (460.39 Kb application-pdf)
13-10-2023
2475 Odisha Rehabilitation and Upgradation of Four/Six laning of Puintola to Tangi (km 284+0- Km.359+590) section (Pkg-1) of NH-5 (New NH-16) in the State of Odisha on EPC mode-Execution of 02 Nos. Individual Rural Piped water supply projects pertaining to (i) Chilika, Tangi, Banapur Blocks & (i) Khordha, Jatani of Khordha Districts including 5 years of O&M regarding RoW clearance from NH for laying of pipe in Chilika scheme of Khordha district (14.19 Mb application-pdf)
13-10-2023
2476 Tamil Nadu Proposal for laying proposed 24” Dia Steel Gas Pipeline along with OFC Duct on NH-544 from Kumarapalayam to Chengapalli section from Km 53/525 to Km 102/035 (RHS) for a total length of 48.510 Km in the limit of NHAI Salem by M/s.Gail (India) Limited, Chennai (1.47 Mb application-pdf)
13-10-2023
2477 Rajasthan Proposal for grant of permission for laying 400mm & 1600mm dia from Km. 4+700 to 8+7200 (LHS), from Km, 8+720 to 34+00 (RHS) and from Km. 34+00 to 47+650 (LHS) and 2 Nos. road crossing at Km. 8+720 & 34+400 (Total length 42.950 Km.) for PHED drinking water pipeline between Dausa to Lalsoot, on NH-148 under water supply transmission main from Isarda Dam to WTP, IPS Bagri and CWRs for various clusters of Distt. Dausa construction of WTP, Pump Houses and CWRs under Isarda-Dausa water supply project under Jal Jeevan Mission (JJM) Distt-Dausa (Pkg-1st) by PHED (7.45 Mb application-pdf)
13-10-2023
2478 Uttar Pradesh Proposal for overhead crossing for LILO of 220 KV S/C Chinhat (220) - C.G.City (Lucknow) line at 400 KV S/S Mohanlalganj Transmission Line at Ch.203.803 on Lucknow Sultanpur Road NH-731 (Old NH-56) in the State of Uttar Pradesh (963.17 Kb application-pdf)
12-10-2023
2479 Punjab Operation & Maintenance of 4-lane Zirakpur to Start of Sangrur Bypass Section of NH-64 (New NH-07) from km. 0.000 to km. 110.720 in the State of Punjab, Regarding NOC proposal for laying of RCC Sewer Line (600mm I/D Pipe) at km. 0.890 (RHS) to km. 1.080 (RHS) (Total length 190m) on NH-64 (New NH-07) (Rajpura to Zirakpur Road) in the State of Punjab (828.64 Kb application-pdf)
12-10-2023
2480 Uttarakhand Four laning of Nagina Kashipur section of NH-74 from Km.73.000 (Design Chainage Km.71.614) to Km.175.00 (Design Chainage Km.170.407) in the State of Uttar Pradesh under NHDP-IV on EPC mode (1.15 Mb application-pdf)
12-10-2023

Pages