Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
2391 Gujarat Proposal seeking ROW permission for crossing Water Pipeline at Km 65+860 and at Km 79+770 of NH-47 of Kapadvanj-Lasundra Aug. Water Supply Scheme under NRDWP in the State of Gujarat (1.21 Mb application-pdf)
08-11-2023
2392 Uttar Pradesh Proposal for permission of laying underground crossing of 400 KV XLPE insulated Cable between Km. 575–576(Ch. 575.245) across NH-19 (Old NH-2) Fatehpur to Prayagraj Section Village–Ahiran Mahicha, District–Fatehpur in the State of Uttar Pradesh (3.43 Mb application-pdf)
08-11-2023
2393 Gujarat Proposal for requesting permission for laying water pipeline across at km. 152/800 at Village-Nimgaon Bhojapur, Tal. Sangamner, District-Ahmednagar on NH-60 (488.87 Kb application-pdf)
07-11-2023
2394 Maharashtra Proposal for requesting permission for laying water pipeline across at Km. 152/800 at Village-Nimgaon Bhojapur, Tal.-Sangamner, District-Ahmednagar on NH-60 (431.48 Kb application-pdf)
07-11-2023
2395 Rajasthan Submission of NH crossing case for construction of 132KV GSS Rajiasar along with 132KV 5/6 Transmission line using 132 KV 400 Sqmm, 1 Spare) between 132 KV GSS Rajiasar and Railway TSS Rajiasar (290.02 Kb application-pdf)
07-11-2023
2396 Gujarat Proposal seeking ROW permission for underground Crossing of 2 nos. 11KV Electric Cable (185 Sqmm) & 110MM Dia HDPE Pipe across NH-27 at Km 603+070, Village-Khemana, Taluka-Palanpur, District–Banaskantha in the State of Gujarat (1.34 Mb application-pdf)
07-11-2023
2397 Gujarat Proposal for permission for laying of 03 Nos. underground 132 KV EHV cable of M/s Torrent Power Ltd for GMRCL’s at RSS at Indroda park across /along NH-147 at km 13/300 to km 13/400 (crossing) 6.080 (crossing) and km 6.080 to km 6.800 (along) in the State of Gujarat (829.94 Kb application-pdf)
07-11-2023
2398 Uttar Pradesh Request for the permission for the laying of underground GAS Pipe Line of M/s Bagpat Green Energy Private Limited for 150 mm Steel Pipeline & 125 mm dia of MDPE Pipe from Ch. 26+458 to Ch. 27+004 LHS is length= 546M, 150MM Steel Pipeline & 125MM Dia of MDPE Pipe from Ch. 27+004 to Ch. 31+600 RHS is length=4.596KM on along & crossing at Ch. 27+004 is length=30m with the Akshardham Eastern Peripheral Expy road, National Highway, New NH-709B (Old SH-57), in the District-Baghpat State of Uttar Pradesh (6.30 Mb application-pdf)
07-11-2023
2399 Maharashtra Proposal From MSEDCL for crossing of 11 KV underground cable line across NH-60 at Km. 163/500, Km. 164/600, Km. 166/600, Km.172/500 & Km. 180/800 Total 5 Crossings on NH-60 (612.90 Kb application-pdf)
07-11-2023
2400 Karnataka Four Laning of Hospet-Chitradurga section of NH-13 (New NH-50) from km 299+000 to km.418+750 in the State of Karnataka under National Highways Development Project (NHDP) Phase-III on DBFOT (Toll) basis (“Project”) (232.47 Kb application-pdf)
06-11-2023

Pages