Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
2191 Delhi Permission for laying of underground optical fiber cable from route at km 22.885 to km 23.160 (LHS) and crossing at km 24.810 on National Highway No.-8 of Delhi-Jaipur Road, Haryana (1.59 Mb application-pdf)
15-05-2023
2192 Gujarat Proposal seeking ROW Permission for laying of proposed 125mm @PE underground Gas Pipeline along NH-48 (Kadodara-Palsana) (Ahmedabad-Mumbai) (i) from Km 263+523 to Km 265+241 (RHS) (147-01), (ii) Km 264+416 to Km 264+523 (LHS) (147-02), (iii) Km 264+416 to km 265+118 ) (LHS) (147-03), (iv) Km 263+787 to Km 263+819 Km) (RHS) (147-06) and across Km 265+118 (147-03) & Km 263+787(147-06) to provide Gas Supply for Various Connectivity in Taluka-Palsana of District-Surat (SOP-E&P/Surat/147) in the State of Gujarat (2.40 Mb application-pdf)
15-05-2023
2193 Gujarat Proposal seeking ROW permission for laying 66KV Kathala LILO Line from 66KV Rupakheda (Zalod)-Navlai D/C Line (One Circuit LILO) Overhead Crossing on D/C Panther Tower with ACSR Panther Conductor on Dahod-Indore NH-47 at Km 209+694, Near Village-Vadbara Taluak Dahod, District-Dahod in the State of Gujarat (2.55 Mb application-pdf)
15-05-2023
2194 Gujarat Proposal seeking ROW permission for crossing NH-113 at Km 238+086 between Jhalod to Dahod section near Village-Limdi for laying Drinking Water Supply Pipeline, Taluka Jhalod, District-Dahod in the State of Gujarat (2.49 Mb application-pdf)
15-05-2023
2195 Gujarat Four laning of Ahmedabad to Godhra Section of NH-47 from Km. 4.200 to 122.420 in the State of Gujarat on DBFOT Basis under NHDP Phase-III (2.57 Mb application-pdf)
15-05-2023
2196 Haryana Proposal for laying of underground Gas pipeline of M/s IGL from Km. 441+275 to km. 416+295 (LHS) & crossing at km. 441+275, km. 428+475, km. 426+210, km. 416+295 by HDD method on NH-352 on Jhajjar to Rewari Road, Tehsil & District Rewari (HR) (1.76 Mb application-pdf)
15-05-2023
2197 West Bengal Permission for laying 10 inch dia underground natural gas steel pipeline along NH-34 from Paschim Mahadebpur Ch. 331.400 to Narayanpur More Malda Ch. 394.979 for a total length of 63.57 Km in Uttar Dinajpur & malda District of West Bengal State of NH-34 (1.52 Mb application-pdf)
12-05-2023
2198 Uttar Pradesh Request for Right of Way permission for laying/crossing of Electrical Cable/ HDPE Pipe on NH-19 & road crossing at Km. 489.115, Km. 491.280, Km. 491.042 & Km. 505.660 on Kanpur–Fatehpur Section in the State of Uttar Pradesh (3.58 Mb application-pdf)
12-05-2023
2199 Karnataka Proposal seeking permission for laying of 110KV Underground Electrical Cable along the road from Km.45/810 to Km.46/740; Km.46/812 to Km.46/827; Km.46/929 to Km.46/942 (RHS) & Km.47/025 to Km.47/789; Km.47/891 to Km.47/906; Km.48/038 to Km.48/137 (LHS) by Open Trench Method and from Km.46/740 to Km.46/812; Km.46/827 to Km.46/929(RHS); Km.47/789 to Km.47/891; Km.47/906 to Km.48/038; Km.48/137 to Km.48/205 (LHS) & across the road at Km.45/800 & Km.47/025 by Trenchless Method with a provision of duct 2.60m X 1.65m in 6 locations on Madurai–Ramanathapuram section of NH 49 road (986.39 Kb application-pdf)
12-05-2023
2200 Uttar Pradesh Request for grant of Right of Way permission to lay Optical Fiber Cable along the route from Km. 52.700 to Km. 58.100 on NH-34. Total Section length ROW applied for 5.400 Km. (Sajeti) as per attached drawing in the State of Uttar Pradesh (3.34 Mb application-pdf)
12-05-2023

Pages