Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
2001 Maharashtra 4 laning of MP/Maharashtra Border-Dhule section nf NH-3 (New NH-52)-Submission of comments for the proposal for crossing of pipeline at km 244.800 for the Sulwade Jamphal Kanoli Lift Irrigation Scheme, Dhule (561.68 Kb application-pdf)
28-03-2024
2002 Tamil Nadu Laying of Drinking water pipeline from km. 91/670 to km. 91/910 (LHS) and road crossing at km.91/670 on Krishnagiri Walajahpet section of NH-48 by Executive Officer, Odugathur Town Panchayat, Odugathur (1,019.97 Kb application-pdf)
28-03-2024
2003 Tamil Nadu Laying of Drinking water pipeline from Km. 96/300 to Km. 99+150(LHS), Km.94/400 to Km. 94/650(LHS), Km.93/340 to Km.94/650(RHS), Km. 97/880 to Km. 97/990 (RHS) and road crossing at km. 97/770 on Krishnagiri Walajahpet section of NH-48 by Executive Engineer, Pallikonda Town Panchayat, Vellore District (1.79 Mb application-pdf)
28-03-2024
2004 Maharashtra Permission for laying of 33KV underground cable by Horizontal Directional methodl (HDD method) for electrical cable across NH at Km. 119+700 abutting on boundary of NH-150E on boundary of Akkalakot-Solapur Road in the Village-Valsang Tal. south Solapur in the State of Maharashtra (3.16 Mb application-pdf)
28-03-2024
2005 Maharashtra Widening of existing 2 lane carriage way to 4/6 lane carriageway configuration for Dhule–Pimpalgaon (Km 265.00 to Km 380.00) section of NH-3 in the State of Maharashtra–MSEDCL’s Proposal for 02 no. of Crossings of 11 KV Electrical Cable at Km. 265.000 & Km. 380.000 at Village Arvi, Tal. & District-Dhule across NH-3 (89.62 Kb application-pdf)
28-03-2024
2006 Rajasthan Permission for Laying 132 KV Electrical Cable Boring dia 0.7m on Jaisalmer-Chandan Section of NH-11 on Km. 146+0 (ROW 45m) Lat. 27.002665 Long 71.349258) at village Chandan, Tehsil-Jaisalmer, District-Jaisalmer in the State of Rajasthan (996.31 Kb application-pdf)
28-03-2024
2007 Delhi Conversion of Delhi-Gurgaon Section of NH-8 Access Controlled Eight/Six lane Highway from Rao Tula Ram Marg junction (Km. 14.300) to Km. 42.000 Gurgaon in Haryana on BOT basis: Reg. Proposal for permission for laying of 125mm MDPE Pipeline from NH Ch. Km21.750 (The Umrao Hotel) to NH Ch. Km-23.250 (City Park Airport Hotel) along NH-48 in NCT of Delhi (528.72 Kb application-pdf)
27-03-2024
2008 Tamil Nadu Proposal seeking permission for Pole Erection of 33KV lines along the Road from Km.205/581 to Km.205/761 (LHS & RHS) and crossing at Km.205/761 for total length of 421m & total no. of poles 8 No’s on Trichy to Kallagam Section of NH-81(Old NH-227) (274.04 Kb application-pdf)
27-03-2024
2009 Haryana Proposal for grant of Permission to M/s Megha City Gas Distribution Private Limited for laying of 125 mm MDPE Natural Gas pipeline along on NH-15 (New NH-54), Amritsar–Tarn Taran–Harike Section from Km 126.075 (RHS) to 129.611 (RHS), (Total Length–3.536 Km) in District-Tarn Taran in the State Of Punjab by HDD Method (134.25 Kb application-pdf)
27-03-2024
2010 Gujarat Proposal of M/s Gujarat Gas Limited for permission of laying 90 mm dia. gas pipeline along (from km 265/465 to 265/782 RHS) & across (at km 265/465) to NH 56 (Dahod-Alirajpur) in Taluka & District-Dahod in the State of Gujarat (3.65 Mb application-pdf)
27-03-2024

Pages