Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
1531 Assam Permission for laying of underground 63mm Dia carrier pipe in 200mm casing steel pipe MDPE Natural Gas pipeline for B.L Tea Factory at village: Sukan Pukhuri, Circle: Mahmora, District: Charaideo in the State of Assam through HDD method NH-37 across the NH at Ch. 547+750.04 and through open trench method NH-37 along the NH from Ch.548+-197.27 to 547+750.04 (Length 447.27 meter) (346.06 Kb application-pdf)
16-01-2024
1532 Uttar Pradesh Permission of underground water supply pipeline crossing by HDD method at Km. 5+360 on NH-31 (Raebareli–Unnao) at District-Unnao in the State of Uttar Pradesh (4.74 Mb application-pdf)
16-01-2024
1533 Gujarat Proposal seeking ROW permission of laying Underground proposed 90mm Dia PVC Water Pipeline across NH-27 at Km 43+530 by HDD (Horizontal Directional Drilling) method for individual irrigation demands at Village–Ujjad Thepda, Tal-Kutiyana, District-Porbandar in the State of Gujarat (1.23 Mb application-pdf)
16-01-2024
1534 Maharashtra Proposal for overhead of 11 KV Electric Line in Land along the road NH-361 at Chainage km 488.400 to km 488.600 LHS of Nagpur-Wardha section near Bharat Petrolium at Gondapur Th. Seloo, District-Wardha for existing supply from 11 KV Pawnar Gaothan Feeder Connecting Permission Requested (730.39 Kb application-pdf)
15-01-2024
1535 Gujarat Application for the permission of laying Underground proposed 90mm dia PVC water pipeline crossing within NH ROW across NH-27 by HDD (Horizontal Directional Drilling) method for individual irrigation demands at ch. 43+540 km at village (1.24 Mb application-pdf)
13-01-2024
1536 Uttar Pradesh Proposal for permission for laying of Optical Fiber Cable (OFC) (40mm PBL Pipe) underground duct line of M/s Bharat Sanchar Nigam Limited from Km. 40.310 to 43.820 (RHS), Length 3510m on NH-24 (New NH-09), Delhi to Hapur Road in the State of Uttar Pradesh (12.85 Mb application-pdf)
12-01-2024
1537 Odisha Rehabilitation and Up-gradation of Jharpokharia-Baripada-Baleshwar section of NH-5 from Km.0+000 to Km.80+600 in the State of Odisha under NHDP Phase-IV on EPC Mode-Laying of water supply pipeline from Km.77+130 to Km.77+365 of NH-18 and crossing at Km.77+365 in Mayurbhanj District (15.54 Mb application-pdf)
12-01-2024
1538 Odisha Rehabilitation and Up-gradation to six laning of Bhadrak-Balasore section of NH-5 (New NH-16) from Km.136+500 to Km.199+141 in the State of Odisha to be executed on Hybrid Annuity Mode under NHDP Phase-V - Laying of water supply pipeline from Km.189+200 to Km.195+650 & Km.196+325 of NH-16 in Balasore District (15.09 Mb application-pdf)
12-01-2024
1539 Odisha Rehabilitation and Up-gradation to six laning of Bhadrak-Balasore section of NH- 5 (New NH-16) from Km.136+500 to Km.199+141 in the State of Odisha to be executed on Hybrid Annuity Mode under NHDP Phase-V- Laying of water supply pipeline from Km.192+080 to Km.193+680 of NH-16 and crossing at Km.193+680 in Balasore District (1.80 Mb application-pdf)
12-01-2024
1540 Karnataka Proposal for laying of OFC cable and 40mm 2 HDPE pipe of M/s P2P Network Private Ltd along between Km 100+000 to 110+000(Baratgi Cross to Vijayapura Bypass T point Road on LHS of NH-52 in the State of Karnataka (2.75 Mb application-pdf)
12-01-2024

Pages