Sorry, you need to enable JavaScript to visit this website.
Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
1051 Tamil Nadu Permission proposal for laying underground water pipe line along the road from km. 75/700 to km. 83/765 (LHS), km. 84/980 to km. 110/680 (LHS), km. 83/605 to km. 83/765 (RHS) and across the road km. 75/700, km. 83/765, km. 84/980 of NH-532) Cuddalore-Vridhachalam-Salem Road) in Cuddalore District in the State of Tamil Nadu- for a total length 34008.10m (along the road length 33925m & across road length of 83.10m) (147.18 Kb application-pdf)
07-08-2024
1052 Maharashtra Proposal to lay underground electrical cable crossing National Highway at 11 KV Cable National Highway at crossing km 33.450 on NH-53 in Nagpur-Kondhali section (670.56 Kb application-pdf)
06-08-2024
1053 Uttar Pradesh Proposal for Permission of laying “U.P. Jal Nigam Kasganj” underground 200mm/150mm Dia Water pipeline on NH-34 at Ch.196.120 to 196.565, Crossing Ch.196.565, Ch.204.089 to Ch.204.964, Crossing Ch. 104.080 & other various locations length=650*2 & crossing at Ch.230+083 length=54.50m along/across Aligarh-Kanpur Section NH-34 in the State of Uttar Pradesh (16.44 Mb application-pdf)
06-08-2024
1054 Uttar Pradesh Permission for laying U/G water pipeline crossing at Ch. 112.110, Village-Nagla Katra, Tehsil-Gabhana & District-Aligarh on NH-34 in the State of Uttar Pradesh (1.80 Mb application-pdf)
06-08-2024
1055 Maharashtra Proposal of grant permission for laying & erection of 30 nos. poles along NH-52 & 01 no. of crossing of 11 KV electric line at Ch. 249.650 village Pachod, Tal. Paithan in District-Aurangabad under Aurangabad Rural Division-I, MSEDCL, on H_52 (Old NH-211) (590.74 Kb application-pdf)
05-08-2024
1056 Gujarat Proposal for laying of 1C x 630 Sq.mm. 66 KV (2+1) XLPE Underground Cable parallel to NH-27 (Raklpt-Porbandar Highway) from Ch. 113+500 to Ch. 113+600 and 02 nos. of crossing across NH-27 at Ch. 1134550 & Ch. 114+700 in licu of construction of Transmission Line from GETCO sub-station at Dhareshwar to Railway Traction sub-station at Jetalsar (532.24 Kb application-pdf)
01-08-2024
1057 Rajasthan Proposal for grant of permission for water supply pipeline laying along the ROW for 04 nos. crossing across NH-52 ) (Deoli-Kota section) in the State of Rajasthan (9.05 Mb application-pdf)
01-08-2024
1058 Rajasthan Proposal for grant of permission for laying water pipe line km 10+100 to 11+300, 13+100 to 16+100, 61+000 to 62+500 (total length 5700m) RHS on NH-68 Jaisalmer Barmer section & underground road crossing at MS 11+300, 16+100, 35+300, 55+400, 62+500 and 64+500 by trenchless technique of village Dabla, Aakal, Devikot Sangar, Fatehgarh and Lordisar, District-Jaisalmer in State of Rajasthan (7.43 Mb application-pdf)
01-08-2024
1059 Jammu & Kashmir Permission for laying of proposed 12 inch steel Gurdaspur-Jammu Gas Pipeline alongwith OFC cable along & across NH-44/NE-5 (Delhi-Amritsar-Katra Expressway) in District-Kathua & Samba in Jammu & Kashmir (34817.72 m in length) (781.83 Kb application-pdf)
01-08-2024
1060 Madhya Pradesh Proposal for permission for laying of 8” steel & 125 mm MDPE pipeline from Ch. 295+500 to Ch. 299+100 (LHS) including 01 crossing on NH-45 (Total length 3.6 km) by M/s Think Gas Bhopal Pvt. Ltd., Bhopal in the State of Madhya Pradesh (21.54 Mb application-pdf)
01-08-2024

Pages