Sorry, you need to enable JavaScript to visit this website.
Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
क्रमांक State Subject Issue Date
91 Uttar Pradesh Proposal for the permission to install Weigh-In-Motion at Check Gate of Mining Department, District- Jalaun ( near Mandi Samiti Kalpi Langarpur) Jhansi-Kanpur Section on NH-27 at Chainage 1536+240 (1.43 Mb application-pdf)
28-08-2025
92 Chhattisgarh ROW permission required on NH-130 for laying of water pipelines on Left side alone the road between open trench method chainage 55+195-57+550, 58+600-60+350, 66+050-88+820 (LHS) HDD method for Crossings 1: 57+550, Raipur-Bilaspur-Katghora, Ambikapur in the State of Chhattisgarh (1,015.57 Kb application-pdf)
28-08-2025
93 Gujarat Proposal seeking ROW Permission for crossing of overhead 765 KV D/C AL-59 hexa South Olpad to Boisar-TT EHT line (Green energy corridor project) under Khavda IV C power transmission limited at DME Ch. 970+489 (VME Ch. 253+037) Near Village-Moti Naroli, Ta.-Mangrol of Surat District (435.58 Kb application-pdf)
28-08-2025
94 Rajasthan Permission for Laying of 33Kv/11Kv Electrical Cable Crossing (Solar Power plant to GSS under KUSUM Scheme) by HDD method boring dia 150mmX 2 Nos. casing on Gagaria -Bakhasar Section of NH-925 at Km 65+960 (ROW 30m) at Village-Itada, Tehsil–Dhanau, District-Barmer in the State of Rajasthan by M/s Kailash Kailash Enterprises, Barmer (96.45 Kb application-pdf)
27-08-2025
95 Gujarat Proposal for Replacement of existing old 750mm dia CI Water Supply Pipeline & installation of New M. S. 1500mm Dia Pipeline for Nimeta Filtration Plant to Sadar Estate Cross Road, Vadodara on NH-48 at KM. 117.600 (447.53 Kb application-pdf)
26-08-2025
96 Uttar Pradesh Proposal for permission of laying underground water supply pipeline from Km. 153+110 to 154+040 (RHS), Km. 153+340 to 154+040 (LHS), Km. 158+560 to Km. 159+210 (RHS), Km. 158+685 to Km. 159+210 and 02 nos. road crossing at km. 154+040 & Km. 158+685 on NH-34 (Aligarh-Kanpur Section) in the State of Uttar Pradesh (351.07 Kb application-pdf)
26-08-2025
97 Gujarat Proposal for Permission for laying 125 MM Dia MDPE gas pipe line along and crossing (Km.150/485 to 164/870) connecting from Changodar to kerala GIDC up to Bavla city, Taluka-Sanand/ Bavla, District-Ahmedabad on NH-47 in the State of Gujarat (929.41 Kb application-pdf)
26-08-2025
98 Uttar Pradesh Request for grant of Right of way permission to lay optical fiber cable along NH-30 from Km.81.700 to Km.81.450 (LHS), from Km.81.200 to Km. 79.600 (RHS), from Km.79.709 to km.77.450 (LHS) & crossing at Km.81.700 and at Km.79.600, Total route length 4.109 km. in Uttar Pradesh (461.35 Kb application-pdf)
26-08-2025
99 Rajasthan Operation and maintenance of De-Scoped Length of 2 lane with paved shoulder Tanot-Jaisalmer [Tank Chowk (Km. 123+550) to Jaisalmer bypass (Km. 125.573) length – 2.023 Km] of NH-68 & 2/4 lane with Paved Shoulder of Jaisalmer-Phalodi section of NH-11 from Km 105.143 to Km 265.600 length 160.457 Km, in the State of Rajasthan (514.22 Kb application-pdf)
26-08-2025
100 Odisha Permission for laying of underground Petroleum Product Pipeline & OFC cable across NH-59 at Km 28/500 (village-Malapara of Balangir district) and NH-353 at km 77/045 (Village-Rajpur of Nuapada district) under Visakhapatnam-Raipur Pipeline Project (VRPL) of HPCL (2.04 Mb application-pdf)
25-08-2025

Pages