302.1 |
Standards to be adopted for Hill Roads |
29-02-1960 |
Standards |
|
|
302.2 |
Plan for development of NHs |
02-04-1970 |
NH1-37(2)/70 |
|
|
302.3 |
Siting of bridges and fixation of alignment of approaches |
29-01-1971 |
NH-40(3)/71 |
|
|
302.4 |
Fixation of grade line for new roads/section of existing roads |
10-09-1976 |
PL-67(12)/76 |
|
|
302.5 |
Camber for road surface for NHs in rural location |
31-05-1977 |
PL-67(5)/76-NHVI |
|
|
302.6 |
Ensuring fluent grade lines at culverts on NHs |
24-12-1977 |
NHIII/P/35/77 |
|
|
302.7 |
Gradients for approaches to Railway Overbridges on NHs |
21-02-1978 |
PL-30(20)/77 |
|
|
302.8 |
Provision of hard shoulders on both sides of carriageway on the approaches of over bridges |
05-10-1978 |
NHII/Misc/37/76 |
|
|
302.9 |
Geometric designs standards of expressways |
10-05-1984 |
RW/PL-30(68)/82 |
|
|
302.10 |
Design of inter sections |
25-07-1984 |
PL-30(49)/79 |
|
|
302.11 |
Geometric design standards for NH World Bank Projects |
26-07-1984 |
PL-30(68)/82 |
|
|
302.12 |
Provision of junctions at the ends of byepasses |
29-09-1984 |
PL-30(49)/79 |
|
|
302.13 |
Typical Cross Section of 4 lane Divided Highway |
19-12-1990 |
RW/NH-33045/5/90-DO II |
|
|
302.14 |
Guidelines for Design of Median Openings on Divided National Highways |
26-06-1992 |
RW/NH-33022/4/92- DO III |
|
|
302.14A |
Type Designs for Intersections on National Highways |
12-02-1993 |
RW/NH-33048/2/87-S&R |
|
|
302.15 |
Setting out of Horizontal/ Vertical Curves and Junctions |
16-02-1993 |
NH-33054/7/92-S&R |
|
|
302.16 |
Passing places on Hill Roads |
28-07-1999 |
RW/NH-33044/11/97–S&R |
|
|
302.17 |
Passing places on Hill Roads |
17-11-1999 |
RW/NH-33044/11/97–S&R |
|
|
302.18 |
Ministry’s guidelines regarding formation with geometrics improvement and safety measures on hill roads |
09-03-2007 |
NH-12037/G33/2006/NH-1 |
|
|
302.19 |
Development of stretches under IRQP following Corridor Development Approach |
03-01-2011 |
NH-20013/1/2009-P&M |
|
|
302.20 |
Preparation of DPR/Feasibility study reports-option of split highway in case of four laning of hill roads |
04-04-2012 |
RW/NH-33044/3/2012-S&R(R) |
|
|
302.21 |
Capacity building and lane width of National Highways |
05-10-2012 |
NH-14019/6/2012-P&M |
|
|
302.22 |
Guidelines for Pedestrian Facilities on National Highways for Persons with Disabilities |
17-06-2015 |
RW/NH-33044/28/2015/S&R(R) |
|
|
302.23 |
Capacity augmentation of National Highways from Two-lane to Four-lane |
29-06-2015 |
RW/NH-33044/28/20l5/S&R (R) |
|
|
302.24 |
Capacity augmentation of National Highways from two lane to four lane |
26-05-2016 |
RW/NH-33044/37/20l5/S&R (R) |
|
|
302.25 |
Standards for Lane width of National Highways and roads developed under Central Sector Schemes in Hilly and Mountainous terrains |
23-03-2018 |
NH-15017/28/ 2018 – P&M |
|
|
302.26 |
Guidelines for implementation of Pedestrian facilities on National Highways for persons with Disabilities |
12-04-2018 |
RW/NH-34066/2/18-S&R(B)(P&B) |
|
|
302.27 |
Report sought by National Human Rights Commission regarding adherence to Ministry's and IRC:103 "Guidelines for pedestrian facility" for persons with Disabilities |
30-07-2018 |
RW/ NH-34066/2/2018-S&R(B )(P&B) |
|
|
302.28 |
Width of shoulder (Paved and Earthen) for two laning of National Highways |
17-07-2020 |
RW/NH-33044/22/2020-S&R(P&B) |
|
|
302.29 |
Standards for Lane width of National Highways and roads developed under Central Sector Schemes in Hilly and Mountainous terrains |
15-12-2020 |
NH-15017/28/2018-P&M |
|
|
302.29 |
Width of Shoulder (Paved & Earthen) for National Highways |
04-06-2024 |
RW/NH-33044/22/2020-S&R |
|
|