Sorry, you need to enable JavaScript to visit this website.
Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
S. No. State Subject Issue Date
101 Gujarat Proposal seeking ROW permission for Drinking water supply Details of laying parallel Pipeline laying from Km 0+000 to Km 15+780 & 3 nos. crossing (i) Km 0+100 (ii) Km 9+890 & (iii) Km 15+780 of NH-53, Village-Hazira to Ichhachhpor, Taluka Choryasi, District-Surat under Aug. of Variav Package-1 RWSS in the State of Gujarat (1.58 Mb application-pdf)
13-03-2024
102 Bihar Proposal for crossing of Existing NH-107 by new 132KV D/C Murliganj-udakishunganj Transmission line (3.08 Mb application-pdf)
13-03-2024
103 Rajasthan Permission for work of Retrofitting of cluster Water supply Project Package-V of Chambal-Bhilwara Water Supply Project Phase-1I of Shahpura Tehsil of District-Bhilwara under JMM for 11 Nos. Crossing & Laying Water Pipeline in 495 mtr in ROW (2.66 Mb application-pdf)
13-03-2024
104 Delhi Routine Operation and Maintenance of Delhi-Gurgaon section of NH-48 & other works along the project highway from Km. 11.060 to 42.000 (Dhaula Kuan in Delhi to Kherki Dhaula Fee Plaza in Haryana) for a period of one year on Item rate basis–work permission for repair & maintenance of existing gas pipeline along NH-48 between 37.770 to 38.370 (LHS) (129.48 Kb application-pdf)
12-03-2024
105 Haryana NOC to lay DI Pipeline-Proposal for grant of permission for laying of water supply pipeline of 300mm along and across proposed NH-148NA (Jewar International Airport connectivity) Yamuna Expressway Industrial Development Authority (YEIDA) (309.25 Kb application-pdf)
12-03-2024
106 Gujarat Proposal seeking ROW Permission for laying and Crossing of proposed UG 125mm @ PE & 4" @ Steel Gas Pipeline along National Highway-53 from (i) Km 23+897 to Km 24+898 (Hazira-Palsana), (ii) from Km 23+897 to Km 24+915 (Hazira-Palsana) & across NH-53 at (iii) Km 23+897, Village-Budiya, Taluka-Surat, District-Surat GA in the State of Gujarat (3.43 Mb application-pdf)
11-03-2024
107 Gujarat Proposal seeking ROW Permission for laying and Crossing of proposed UG 125mm @ PE & 4" @ Steel Gas Pipeline along National Highway-53 from (i) Km 30+500 to Km 30+729 (LHS) (Hazira-Palsana), (i) from Km 30+500 to Km 31+079 (RHS) (Hazira- Palsana) & (iii) across NH-53 at Km 30+500, Village-Budiya, Taluka-Surat, District-Surat GA in the State of Gujarat (3.34 Mb application-pdf)
11-03-2024
108 Rajasthan Permission for work of Retrofitting of cluster Water supply Project Package-VIII of Chambal-Bhilwara Water Supply Project Phase-IT of Mandalgarh-Bijoliya Tehsil of District-Bhilwara under JMM for 3 Nos. Crossing & Longitudinal Laying Water Pipeline in 6193 mtr in ROW (4.04 Mb application-pdf)
11-03-2024
109 Haryana Permission for laying of Raw Water Pipeline of Public Health Engineering Department, Rohtak from Km. 118+380 to Km. 120+850 (LHS) (Total length=2470m) on Rohtak to Hisar Section of NH-10 (New NH-09) in Village Bhaini Maharajpur to Singhwa Khas, District-Rohtak in the State of Haryana (470.57 Kb application-pdf)
08-03-2024
110 Haryana Proposal for NHAI approval of M/s Indraprastha Gas Limited for Laying of 6” Carbon Steel/MDPE Natural Gas Pipeline from NH Ch. Km. 8.100 to NH Ch. Km. 11.100 (LHS) along the NH-152 in the State of Haryana (461.95 Kb application-pdf)
08-03-2024

Pages