Construction of Four lane Signature Bridge between Okha and Byet Dwarka on EPC mode in the state of Gujarat
- Project details:
- Length of Bridge: 2320 mt with 900 mt long central cable stayed.
- Project Cost: Rs. 962.43 crore
- Foundation stone laid by Hon’ble Prime Minister on 07.10.2017
- Date of completion: 19-Sept-2021
- Physical progress of the work is 8%.