Published on
Ministry of Road Transport & Highways, Government of India
(
http://morth.gov.in
)
Date : 20-01-2021 22:56:04 pm
State
- Any -
Andhra Pradesh
Arunachal Pradesh
Assam
Bihar
Chhattisgarh
Goa
Gujarat
Haryana
Himachal Pradesh
Jammu & Kashmir
Jharkhand
Karnataka
Kerala
Madhya Pradesh
Maharashtra
Manipur
Meghalaya
Mizoram
Nagaland
Odisha
Punjab
Rajasthan
Sikkim
Tamil Nadu
Telangana
Tripura
Uttarakhand
Uttar Pradesh
West Bengal
Andaman & Nicobar Islands
Chandigarh
Dadar & Nagar Haveli
Daman & Diu
Delhi
Lakshadeep
Puducherry
Ladakh
Subject
Items per page
10
25
50
100
- All -
Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
S. No.
State
Subject
Issue Date
1
Haryana
NOC case for laying of Optical Fiber Cable (OFC) of M/s Telesonic Networks Ltd. from Km. 12.380 LHS to Km. 13.800 LHS (Length 1420m), Km. 14.380 LHS to Km. 21.320 LHS (length 6940m), & Km. 11.885 RHS to Km. 43.990 RHS (length 2105m), Km. 15.260 RHS to Km. 21.320 RHS (Length 6060m), & one crossing at Km. 21.320 (length 58m), (total length 16583m) on NH-248A (Gurgaon to Sohna road) in the state of Haryana (1.13 Mb
)
20-01-2021
2
Odisha
Permission for laying of 6" dia, Spurline of JHBDPL (Jagdishpur - Haldia - Bokaro - Dhamra) Gas pipeline and 40 mm dia. HDPE for OFC (Optical Fiber Cable) along NH-49 at the location Chainage Km.250.500 to Km.264.700 and across NH-49 at the location Chainage Km.250.500and Km.264.700in Jnarsuguda District of Odisha State (7.14 Mb
)
20-01-2021
3
Tamil Nadu
PIU–Coimbatore – Implementation of ‘Bharatmala Pariyojana’ Phase – I – Assigning 3 Project Stretches / NHs to Tamil Nadu State NH- wing – “Mettur – Bhawani – Erode – NH-544 – Updation of Detailed Project Report (DPR) prepared by Tamil Nadu Road Sector Project (TNRSP) for NHAI – Salem (NH) Circle – Gobichettipalayam (NH) Division – Proposal seeking permission for laying of underground agricultural 400mm dia pipeline from Km 61/640 to Km 63/080 (RHS) and across the road at Km 63/080 at NH544H of Thoppur – Mettur Dam – Bhavani – Erode Road at S.F.No.: 67/2D at Padavalkalvai Village, Bhavani Taluk, Erode District from this site to S.F.No.: 236/2B at Mathur Village, Anthiyur Taluk, Erode District, Tamil Nadu (1.02 Mb
)
19-01-2021
4
Tamil Nadu
NHAI, Madurai Region – Highway Administration – laying of cables under PIU, Thanjavur - Permission for laying underground Optical Fiber Cable by M/s. Jio Digital Fibre Pvt Ltd, Chennai along highway (i) From 89/800 to Km.91/800 on Thanjavur – Trichy section of NH83 (Old NH 67) in the State of Tamil Nadu (1.42 Mb
)
19-01-2021
5
Chhattisgarh
Permission for laying underground Optical Fiber Cable from Km.60.778 to Km.97.600 (From Village Kenda to Ratanpur at Mahamaya Mandir Turning) section of NH-45 Ext., in Block- Kota, District-Bilaspur, State- Chhattisgarh (4.85 Mb
)
19-01-2021
6
Haryana
Rehabilitation and up-gradation of existing 2 lane with paved shoulder of Jhajjar-Loharu Section from Km 130.770 to Km 228.630 of NH-334B in the State of Haryana on EPC basis under NH(O)-Part-I as 2-lane with paved shoulder-NOC for laying of HDPE Rising main from 5 MLD STP Charkhi Dadri to Drain No. 8 of diameter 500 mm o along New Nh-334 B from Km 3.300 to Km 9.300 (RHS) in District Charkhi Dadri in the State of Haryana by open cut method (1.00 Mb
)
19-01-2021
7
Haryana
Request for granting the permission to lay 900 mm diameter casing water pipeline (MS pipe) for the project of Delhi Jal Board, Govt. of NCT of Delhi for crossing at Km. 22.175 on NH08 (new NH-48) in village Rajokri, Tehsil – Vasant Vihar & district New Delhi (1.06 Mb
)
18-01-2021
8
Odisha
Execution of 3 No's of Individual Rural Piped Water Supply Project in Hemgiri, Kutra & Rajgangpur Block of Sundargarh Dist. Including Five Years Operation & Maintenance" on EPC basis - Permission to lay pipe line Across NH-49 at the Chainage Km.208.355 (5.40 Mb
)
18-01-2021
9
Kerala
NHAI-RO Kerala-Six laning of Start of Kollam bypass to Kadambattukonam Section of NH-47 (New NH-66) (from Design Ch.486+000 to Design Ch. 517+250) (Total length 31.25 km) in the State of Kerala on Hybrid annuity Mode under Bharatmala Pariyojna-Request for laying of OFC cable from Km 494+320 to Km 494+920 and from Km 496+300 to Km 499+500 by Reliance Jio Infocom Ltd (301.07 Kb
)
17-01-2021
10
Kerala
NHAI-RO Kerala-Four Laning of Walayar-Vadakkenchery (Km 182.250 to Km 240.000) of NH-544 on BOT(Toll) basis- Operation & Maintenance stage - Laying/crossing of underground Natural Gas pipeline in between Km.188.050 and 191.900 and of NH-544 for a length of 3.895Km by M/s IOAGPL (280.31 Kb
)
17-01-2021
Pages
1
2
3
4
5
6
7
8
9
…
next ›
last »